Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 21, 2026 SAM #9034
SOLICITATION NOTICE

61 -- FY26 NRM 654-26-020 | 654-26-2-6059-0042 | Bldg 12 Pump Power Relocation | VA Sierra Nevada Health Care System Reno, NV

Notice Date
8/19/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
261-NETWORK CONTRACT OFFICE 21 (36C261) MATHER CA 95655 USA
 
ZIP Code
95655
 
Solicitation Number
36C26126R0050_0001
 
Response Due
8/21/2026 12:30:00 PM
 
Archive Date
10/13/2026
 
Point of Contact
Edwin Rivera, Contract Specialist, Phone: 7757867200
 
E-Mail Address
edwin.rivera@va.gov
(edwin.rivera@va.gov)
 
Small Business Set-Aside
SDVOSBS Service-Disabled Veteran-Owned Small Business (SDVOSB) Sole Source (FAR 19.14)
 
Description
SOLICITATION NO: 36C26126R0050 Amendment 0001 PROJECT TITLE: Project 654-26-020, Building 12 Pump Power Relocation LOCATION: VA Sierra Nevada Health Care System (Reno VAMC), Reno, NV NAICS CODE: 238210 (Electrical Contractors and Other Wiring Installation Contractors) PRODUCT SERVICE CODE (PSC): 6150 (Miscellaneous Electric Power and Distribution Equipment) SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) AMENDMENT 0001 � SOLICITATION UPDATE & PROPOSAL DUE DATE EXTENSION The Department of Veterans Affairs, Network Contracting Office (NCO) 21, is issuing Amendment 0001 to formally amend Request for Proposal (RFP) 36C26126R0050. Due to a system transmission error that delayed the release of previous draft updates, this consolidated amendment formally implements the following updates to the solicitation package: 1. PROPOSAL DUE DATE EXTENSION: The deadline for receipt of proposal packages is formally extended to Friday, August 21, 2026, at 12:30 PM PDT. All technical and price volumes must be submitted electronically via email to the Contract Specialist, Edwin Rivera (edwin.rivera@va.gov). 2. REVISED STATEMENT OF WORK (SOW): Formally deletes the previous SOW V2 and replaces it in its entirety with ""SOW Bldg 12 Power Relocation V3, dated August 13, 2026"" to clarify physical basement parameters. 3. INCORPORATION OF TECHNICAL BASES: Formally attaches and incorporates the following technical baseline files discussed during the on-site walkthrough: - Attachment 1: Drawing titled ""Bldg 12 Basement Pump Power Brief Routing Diagram, dated August 19, 2026"" - Attachment 2: Existing Electrical Panel Schedules labeled ""MCC Schedules 5-6-22"" and ""GNHA 9-18-19"" (to serve as the baseline for the required post-award panel updates, red lines, and one-line diagram modifications under SOW Section 4). ACKNOWLEDGMENT OF AMENDMENT REQUIRED: Offerors must formally acknowledge receipt of Amendment 0001 prior to the Friday, August 21, 2026, 12:30 PM PDT deadline by completing Item15 of Standard Form 30 (SF-30) and submitting a signed copy with their final proposal package. Failure to acknowledge this consolidated amendment may result in your proposal being determined non-responsive. Except as provided herein, all other terms and conditions of the solicitation remain unchanged and in full force and effect.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/8baeeff709d9403ca40cdbc99eb71627/view)
 
Place of Performance
Address: Reno, NV 89502, USA
Zip Code: 89502
Country: USA
 
Record
SN07935195-F 20260821/260819230054 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.