MODIFICATION
16 -- DRAFT RFP - Landing Gear Collaborative Supply Chain Integration II
- Notice Date
- 8/19/2026 12:00:00 AM
- Notice Type
- Solicitation
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- DLA AVIATION AT OGDEN, UT HILL AIR FORCE BASE UT 84056-5820 USA
- ZIP Code
- 84056-5820
- Solicitation Number
- SPRHA1-26-R-1003
- Response Due
- 3/1/2027 4:00:00 PM
- Archive Date
- 09/01/2027
- Point of Contact
- Nathan Flinders, Justin Rogers
- E-Mail Address
-
nathan.flinders@dla.mil, justin.rogers.28@us.af.mil
(nathan.flinders@dla.mil, justin.rogers.28@us.af.mil)
- Small Business Set-Aside
- SBA Small Business Set Aside - Total
- Description
- RFP Description: Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) Overview Defense Logistics Agency (DLA) Aviation at Ogden is issuing this formal solicitation for the Landing Gear Collaborative Supply Chain Integration 2 (LG-CSCI2) program. This requirement is being competed as a 100% Small Business Set-Aside under full trade-off source selection procedures. Solicitation Number: SPRHA1-26-R-1003 Set-Aside Status: 100% Small Business Set-Aside NAICS Code: 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing PSC Code: 1620 - Aircraft Landing Gear Components Contract Type: Single-Award ID/IQ (Firm-Fixed-Price with EPA) Period of Performance: 10 Years (5-Year Base + One 5-Year Option) Scope of Work The LG-CSCI2 program provides performance-based supply chain support for competitive landing gear components associated with USAF aircraft. The scope encompasses approximately 2,800 National Item Identification Numbers (NIINs), including USAF Depot Level Reparables (DLRs) and DLA consumables. These range from simple consumable items to complex DLRs requiring forgings and long lead times. The Prime Contractor will provide end-to-end supply chain management, engineering oversight, quality assurance, and procurement. Key program objectives include: Achieving a 95% On-Time Delivery (OTD) rate for DLA-managed parts and a 90% OTD rate for USAF-managed parts. Reducing Production Lead Times (PLTs) across the supply chain by a minimum of 25%. Executing strategic raw material purchasing, forging die management, and Obsolescence/DMSMS management. Solicitation Attachments & Instructions The official Request for Proposal (RFP), Technical Requirements Document (TRD), and other applicable attachments are provided in this posting. Note on Bid Sets: Bid sets for the individual NIINs are not hosted directly on SAM.gov. They will be mailed via removable drives to interested parties. Please provide your firm's mailing address to the DLA Contracting POCs listed below to request a removable drive be mailed to you. Points of Contact: Primary: Nathan Flinders, Contracting Officer (nathan.flinders@dla.mil) Secondary: Justin Rogers, Contracting Officer (justin.rogers.28@us.af.mil)
- Web Link
-
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/236ea9801fef498e9a7bfd2755329c94/view)
- Place of Performance
- Address: USA
- Country: USA
- Country: USA
- Record
- SN07933880-F 20260821/260819230044 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |