Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 21, 2026 SAM #9034
MODIFICATION

Y -- Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Notice Date
8/19/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
W071 ENDIST PORTLAND PORTLAND OR 97204-3495 USA
 
ZIP Code
97204-3495
 
Solicitation Number
W9127N26BA024
 
Response Due
9/18/2026 3:00:00 PM
 
Archive Date
10/03/2026
 
Point of Contact
Christopher Burroughs, Justin Figueredo
 
E-Mail Address
christopher.d.burroughs@usace.army.mil, Justin.F.Figueredo@usace.army.mil
(christopher.d.burroughs@usace.army.mil, Justin.F.Figueredo@usace.army.mil)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
The project consists of replacing the existing bridge with a new fixed bridge on a new alignment and to provide for partial demolition of the existing bridge. The new fixed bridge will be a single-span steel girder bridge with a concrete deck. The bridge width will be 34�4�� out-to-out, with two 11�0� travel lanes, two 2�0� shoulders, a 5�0� sidewalk, and the superstructure will consist of four (4) built-up steel plate girders. The replacement bridge alignment is located immediately downstream of the existing bridge and, at its northern terminus, will fit entirely between the existing bridge and the Bonneville Power Administration transmission tower which is located to the south. Approach roadways will also be constructed to tie into the existing roadway alignment. The new fixed bridge will be located over the existing navigation channel and will provide an under clearance that is larger than is currently present under the existing bridge. The north abutment will be a concrete stub abutment with spread footing anchored into rock. The south abutment will be a concrete abutment that is supported by drilled shafts. To mitigate seismic hazards, portions of the existing bridge will be removed as part of the bridge construction requirement. The existing bridge provides for critical vehicular access to the Bonneville project that must remain open for the entirety of the construction project. This will likely require the contractor to construct the project in phases. In addition, lead and asbestos removal will be required as part of this requirement. Working within environmental and seasonal restrictions and barge crane lifting will be required in close proximity to a high voltage power line will also be necessary during performance of the required work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/649dc0a978a341069f1a42f2fbd0a736/view)
 
Place of Performance
Address: Cascade Locks, OR 97014, USA
Zip Code: 97014
Country: USA
 
Record
SN07933866-F 20260821/260819230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.