Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 20, 2026 SAM #9033
SOLICITATION NOTICE

42 -- SCBA Breathing Air Compressor Filling Station (EU Specification) � USAG Ansbach Fire Rescue

Notice Date
8/18/2026 12:00:00 AM
 
Notice Type
Presolicitation
 
NAICS
333912 — Air and Gas Compressor Manufacturing
 
Contracting Office
0409 AQ HQ CONTRACT APO AE 09227 USA
 
ZIP Code
09227
 
Solicitation Number
PAN40926P0000028932
 
Response Due
9/1/2026 6:00:00 AM
 
Archive Date
09/01/2026
 
Point of Contact
Jean Carlos Silva
 
E-Mail Address
jean.c.silva2.mil@army.mil
(jean.c.silva2.mil@army.mil)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
NOTICE: This pre?solicitation notice is issued for planning and informational purposes only and does not constitute a solicitation or commitment by the Government. All detailed specifications, instructions, and evaluation criteria will be provided in the forthcoming solicitation. DESCRIPTION: The 409th Contracting Support Brigade, Regional Contracting Office (RCO) Bavaria, intends to issue a Request for Quotation (RFQ) for the procurement, delivery, installation, and T�V inspection/certification of one Self?Contained Breathing Apparatus (SCBA) Breathing Air Compressor Filling Station (EU Specification) for USAG Ansbach Fire Rescue. REQUIRED ITEM: SCBA Breathing Air Compressor Filling Station (EU Spec), including: � Breathing air compressor compliant with DIN EN 1012?1; breathing air quality per DIN EN 12021; 550 l/min delivery rate; 350 bar operating pressure; 4 compression stages; electric motor 15 kW / 50 Hz / 400 V; �Super Silent� enclosure. � Monitoring systems: capacitive filter moisture monitoring (normal/pre?warning/saturated), automatic shutdown/lockout on saturation, oil pressure monitoring, final?stage temperature monitoring, cycle counting, and software?based logbook. � 8?outlet �8S� filling configuration on front and rear panels; automatic condensate drain; external control panel with ON/OFF, emergency stop, and operating hours counter. � 6?way stainless steel wall?mounted filling console (1200 mm width) with 6 � 300 bar filling ports, throttles for CFRP cylinders, safety filling plugs, toggle valves with automatic venting, and 400 bar pressure gauge. � 2?port stainless steel filling bar (750 mm width), 2 � 200 bar filling connections, toggle?lever valves, swivel joints, 1?meter filling hoses with safety nipples, adjustable pressure reducer, T�V?certified 225 bar safety valve, dual pressure gauges. � On?site T�V acceptance, cybersecurity inspection, three pre?commissioning inspections of storage cylinders, and all associated travel/mileage. CRITICAL REQUIREMENT � COMPATIBILITY: All filling ports, fittings, hoses, safety filling plugs/nipples, and the compressor system must be 100% compatible and fully interoperable with the customer�s existing Draeger SCBA cylinders, including 300 bar CFRP cylinders, and the current breathing air infrastructure used by USAG Ansbach Fire Rescue. Non?compatible equipment will be determined technically unacceptable.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/21acd78a3cdb4004a3415b97fc6f8f4d/view)
 
Place of Performance
Address: KATTERBACH, DE-BY, DEU
Country: DEU
 
Record
SN07932466-F 20260820/260818230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.