Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 15, 2026 SAM #9028
SOLICITATION NOTICE

Z -- Webbers Falls Excitation System

Notice Date
8/13/2026 12:00:00 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W076 ENDIST TULSA TULSA OK 74137-4290 USA
 
ZIP Code
74137-4290
 
Solicitation Number
W912BV26RA029
 
Archive Date
09/01/2026
 
Point of Contact
Tyler Godwin, Phone: 9186697281, Shawn Brady, Phone: 9186694984
 
E-Mail Address
tyler.l.godwin@usace.army.mil, shawn.brady@usace.army.mil
(tyler.l.godwin@usace.army.mil, shawn.brady@usace.army.mil)
 
Description
Pre-solicitation Notice For Webbers Falls Excitation System Replacements at Webbers Falls, OK This is a PRE-SOLICITATION NOTICE for the Webbers Falls Excitation System Replacements in Webbers Falls, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers � Tulsa has been tasked to solicit for and award a contract for the Webbers Falls Excitation System Replacements, at Webbers Falls, Oklahoma. The proposed design-build project will be procured as an Unrestricted, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Webbers Falls Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles. The estimated magnitude of construction for this project is between $1,000,000 and $5,000,000. The North American Industry Classification System code for this procurement 237990 ( Other Heavy and Civil Engineering Construction) which has a small business size standard of $45M. The Product Service Code is: Z2KA (Repair or Alteration of Dams) Estimated duration of construction of this project is 300 calendar days. Anticipated solicitation issuance date is on or about 31 August 2026, and the estimated proposal due date will be on or about 01 October 2026.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/385c98be005c47aaa6977232e4490668/view)
 
Place of Performance
Address: Webbers Falls, OK, USA
Country: USA
 
Record
SN07926257-F 20260815/260813230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.