Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 15, 2026 SAM #9028
SOLICITATION NOTICE

J -- J--HAULOUT OF THE R/V STURGEON

Notice Date
8/13/2026 12:00:00 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
OFC OF ACQUISITION GRANTS-DENVER DENVER CO 80225 USA
 
ZIP Code
80225
 
Solicitation Number
140G0226R0020
 
Response Due
9/9/2026 10:00:00 AM
 
Archive Date
09/24/2026
 
Point of Contact
Wilson, Mary, Phone: 573-397-2277
 
E-Mail Address
bwilson@usgs.gov
(bwilson@usgs.gov)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
Amendment 0001 provides responses to questions received and includes Attachment 7 Dimensions of Hydrophones NC 1-08 Shielded 4 Post, Attachment 8 W.W Williams Proposal RV Sturgeon Engine and Gear Refresh and Attachment 9 Centek Marine Quote 20734 1. Drawing 26-105-921 HYDROPHONE INSTALLATION states on GENERAL NOTES states ""9. MARPORT HYDROPHONES OUTBOARD MOUNTING ANGLE RESEARVED"". Please verify who and when that information will be provided to Contractor. Answer: Marport is the company that makes the science equipment. Two hydrophones spaced approximately 3m apart (+/- 1.5m from centerline) along the stern, both oriented vertically and toed outboard 15 degrees. One, preferably port, tilted down 15 degrees, and the other down 25 degrees. See Attachment 7 Dimensions of Hydrophone NC 1-08 Shielded 4 Post. 2. Please 7.3 Remove Propulsion Shafts and Inspect states ""All line shaft bearings and shaft seals shall be replaced when clearances fall outside of the acceptable range."" Please verify that the cost associated for any replacement bearings or seals, if necessary, will be part of a Condition Found Report and will be included in a Modification. Answer: Correct. Any conditions identified during the removal and inspection of the bearings and seals will need to be documented by the contractor in a Condition Found Report (CFR) and upon receipt, the Government will review the CFR, and if additional work is approved, the cost will be incorporated into a contract modification prior to the contractor performing the replacement.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/54c7b1c5b5f641d884ad9fbca0d01bea/view)
 
Record
SN07925806-F 20260815/260813230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.