Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 13, 2026 SAM #9026
MODIFICATION

30 -- Solicitation# FA825026R0785: Repair of NSN: 3010013155139, and 3010013152424

Notice Date
8/11/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
811210 —
 
Contracting Office
FA8250 AFSC PZAAA HILL AFB UT 84056-5825 USA
 
ZIP Code
84056-5825
 
Solicitation Number
FA825026R0785
 
Response Due
9/10/2026 3:00:00 PM
 
Archive Date
09/25/2026
 
Point of Contact
RICHARD MAYNARD, Phone: 8017776504, JOHN PRATHER
 
E-Mail Address
RICHARD.MAYNARD.5@US.AF.MIL, JOHN.PRATHER.3@US.AF.MIL
(RICHARD.MAYNARD.5@US.AF.MIL, JOHN.PRATHER.3@US.AF.MIL)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
1.0 SCOPE OF WORK: For the following end item(s), the contractor shall furnish all facilities, parts, materials, data, equipment and services, required to dissemble, inspect, and reassemble. Services to be performed will not be essential in a crisis situation. 1.1 TEST, TEARDOWN, AND EVALUATION: (FFP) The contractor shall perform visual, mechanical and electrical testing of the end item, reusable or replacement component parts, and materials according to the schedule in the contract to determine the condition of the end item. Upon completion of this task, all of the components of the end item requiring repair or replacement will be identified by part number, NSN (if applicable), nomenclature, and location in the assembly. This information will be reported in writing to the Procurement Contracting Officer (PCO) and Technical Report (TR) IAW CDRL D001. 1.2 CONDITIONAL REPAIR: (FFP) (a) Assessment, Reporting, and Timelines: The Contractor shall perform Test, Teardown, and Evaluation (TT&E) on all designated assets. Within 90 calendar days of asset receipt, the Contractor shall submit a detailed Technical Report and a firm-fixed-price proposal for the required repairs to the Procurement Contracting Officer (PCO) in accordance with the Repairable Item Inspection Report (RIIR) CDRL. (b) Proposal Evaluation and Negotiation: Upon receipt of the Contractor's Technical Report and proposal, the Contractor and the PCO shall negotiate the final scope of work, labor hours, parts costs, unit price, and delivery schedule for the required repairs. This negotiation and subsequent review period shall not exceed 90 calendar days from proposal receipt. (c) Bilateral Modification: The final negotiated price and delivery schedule for the authorized repairs shall be established via a bilateral contract modification executed by the PCO. The Contractor is strictly prohibited from commencing any repair work prior to the bilateral modification being fully executed. (d) Execution and Standards: Upon execution of the contract modification, the Contractor shall perform the authorized repair or replacement of failed parts and components. Each end item must be cleaned, refinished, and configured to meet or exceed asset specifications, and returned to like-new Condition A asset in accordance with PWS Section 6.0. (e) Non-Negotiated Assets & Disposition: If a repair modification is not executed following the completion of TT&E, the Contractor shall await written disposition instructions from the DAF. Upon receipt of disposition instructions, the Contractor shall reassemble and return all assets in the same condition (unserviceable, F-Condition) as they were received, packaged 24 Jun 2026 PWS 3010013155139 & 3010013152424 2/8 in accordance with the applicable Special Packaging Instructions (SPI) to the DAF Supply Chain. The labor, reassembly, packaging, and return shipping costs for non-negotiated assets shall be fully inclusive of the baseline TT&E FFP, with no additional cost to the Government. Item Description: GEARCASE-MOTOR NSN: 3010013155139, 3010013152424 Part Number: 120624-101, 120625-101 Quantity: 3010013155139 12 EACH, 3010013152424 8 EACH RFQ/RFP Return Date: 10 SEPT 2026 Copy Note: ***RESTRICTED TO PREQUALIFIED SOURCES***Qualification Requirements: See FAR Part 52.209-1 The requirements of FAR 9.202(a) apply. Sources must be qualified prior to being considered for award. Interested vendors that have not been previously approved for this acquisition must submit a Source Approval Request (SAR) package to the Source Development Small Business Office or the Contracting Officer. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards. For access to the available technical data package (TDP), please email Richard.mnaynard.5@us.af.mil with a current copy of your DD2345 and JCP printout. ***MUST HAVE AN ACTIVE CONDITIONAL OR FINAL CMMC LEVEL 2 ASSESSMENT TO BE CONSIDERED FOR THIS AWARD. SEND THE CMMC ASSESSMENT UID IN THE BODY OF THE EMAIL WITH YOUR PROPOSAL***
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/e580d1590c2d469a8463ae00c43e574b/view)
 
Record
SN07921099-F 20260813/260811230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.