Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 08, 2026 SAM #9021
SOLICITATION NOTICE

Z -- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MD

Notice Date
8/6/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR26BA011
 
Response Due
9/1/2026 7:00:00 AM
 
Archive Date
08/06/2027
 
Point of Contact
Ashley Flaherty, Phone: 4109625626
 
E-Mail Address
Ashley.M.Flaherty@usace.army.mil
(Ashley.M.Flaherty@usace.army.mil)
 
Description
**Amendment 0001 Key Changes Summary: Milestone Extensions:-ProjNet RFI Cutoff: Extended to 13 August 2026, 10:00 AM EDT (originally 03 August).-Bid Submission Deadline: Extended to 01 September 2026, 10:00 AM EDT (originally 25 August).-Virtual Bid Opening: Rescheduled to 01 September 2026, 11:00 AM EDT (originally 25 August).Geotechnical and Sediment Data:-Incorporates four (4) sediment reports for: Craighill Entrance, Craighill Angle, Craighill Upper Range, and Cutoff Angle.-Clarifies that geotechnical data is unavailable and will not be provided for Curtis Bay and Brewerton Angle. Plan Sheet Revisions:-Sheet V116 (Coordinates): Removes F1 from the Dredge Area Coordinates box and updates the coordinates for points F1 and F9.Sheet V112 (Poplar Island): Adds Inflow Point 8 to the Poplar Island drawings. **END Amendment 0001 Key Changes Summary****The project consists of maintenance dredging approximately 2,250,000 cubic yards (cy) from the deep-draft federal navigation channels serving the Port of Baltimore. The work is to be performed between November 2026 through March 2027. The dredging depth for all channels is 50 feet mean lower low water (ft MLLW) with an additional 1 ? 2 foot of allowable overdepth. Approximately 1,538,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island. Approximately 700,000 cy will be dredged from Baltimore Harbor Channels (Brewerton Angle and Curtis Bay Channels) and placed at the Cox Creek Dredged Material Containment Facility. The work areas are within heavy commercial waterways supporting the Port of Baltimore. The equipment required for this work commonly consists of two 30 plus cubic yard clamshell dredges, one 24 ? 30-inch hydraulic unloader, six to eight large tugs, six to eight 2,500 ? 6,000 cubic yard material scows, a drag bar and barge, and appropriate attendant plant and pipeline. The material will be dredged by clamshell/bucket and scow and placed within a period of performance of approximately 120 calendar days from receipt of Notice-to-Proceed.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/777c83c2e9f14fa59a09f3720528ecd2/view)
 
Place of Performance
Address: Baltimore, MD 21201
Zip Code: 21201
 
Record
SN07915734-F 20260808/260810082537 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.