Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 07, 2026 SAM #9020
SOURCES SOUGHT

Y -- Construction Airfield Blast Shield

Notice Date
8/5/2026 12:00:00 AM
 
Notice Type
Sources Sought
 
NAICS
238120 — Structural Steel and Precast Concrete Contractors
 
Contracting Office
FA4661 7 CONS CD DYESS AFB TX 79607-1581 USA
 
ZIP Code
79607-1581
 
Solicitation Number
FA466126R0008
 
Response Due
8/7/2026 2:00:00 PM
 
Archive Date
08/22/2026
 
Point of Contact
James Lynch, Phone: 3256961457, Abigail Spiers, Phone: 3256963862
 
E-Mail Address
james.lynch.18@us.af.mil, abigail.spiers@us.af.mil
(james.lynch.18@us.af.mil, abigail.spiers@us.af.mil)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL�s), and all applicable Federal, State and local regulations/codes. The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ? velocity @ 900 MPH. Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access. Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting. Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations. Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/ba79329aaafc4a0ebf047ea1a60a5a8b/view)
 
Place of Performance
Address: Abilene, TX, USA
Country: USA
 
Record
SN07914505-F 20260807/260810082208 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.