Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 06, 2026 SAM #9019
SOLICITATION NOTICE

Y -- Y--RPFO-NCA VAULT TOILET AND REMOVAL

Notice Date
8/4/2026 12:00:00 AM
 
Notice Type
Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
NEW MEXICO STATE OFFICE SANTA FE NM 87508 USA
 
ZIP Code
87508
 
Solicitation Number
140L1726Q0018
 
Response Due
8/6/2026 7:00:00 AM
 
Archive Date
08/21/2026
 
Point of Contact
Hubbard, Lashondra
 
E-Mail Address
lashondra_hubbard@ios.doi.gov
(lashondra_hubbard@ios.doi.gov)
 
Small Business Set-Aside
SBA Small Business Set Aside - Total
 
Description
The purpose of Amendment 0003 is to post the questions and answers. All other terms and conditions remain unchanged. ______________________________________________________________________________________________________________________________________________________________________________________________ The purpose of Amendment 0002 is to revise the solicitation to an open-market small business set-aside, update the NAICS and PSC Code, update period of performance and extend the solicitation due date. All other terms and conditions remain unchanged. Please download all attachments. RPFO-NCA VAULT TOILET AND REMOVAL Solicitation number 140L1726Q0018 is issued as a request for quote for RPFO-NCA Vault Toilet and Removal requirement. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. This acquisition is set-aside for small business concerns. This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at http://www.acquisition.gov/. A detailed description of the requirement is provided in the attached Statement of Work. The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization. The SOW sets forth the requirements for a Request for Quote (RFQ) for site specific vault toilet removal and installation. The Contractor shall adhere to the following guidance during construction phase(s) of this project: Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, New Mexico State Statutes, New Mexico Department of Transportation, Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements. If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions. All work shall be accomplished in accordance with contract documents and most recent Federal and State regulations. Applicable provisions and clauses are attached. Quotes must be in accordance with the instructions detailed in this section. Failure to submit quotes according to the instructions provided within the solicitation may result in the respondent's quote not being considered for award. Quoters shall submit the following information in its entirety: Complete and Signed Standard Form (SF) 1442 Signed Acknowledgment of amendment 0002 Response to section L and M Payment bond is required 10 calendar days after award Price schedule Offerors must submit your quote referencing the solicitation number. Quotes must be received via email to lashondra_hubbard@ios.doi.gov no later than the solicitation due date. Quotes shall remain valid for a period of 60 calendar days from the specified offer due date. Late quotations will not be considered for award. Award will be made on an all or none basis. Point of Contact Lashondra Hubbard lashondra_hubbard@ios.doi.gov 1.Active Registration - www.sam.gov. To be eligible for an award all interested parties must be registered and active in the System for Award Management (sam.gov) at time an offer or quotation is submitted. Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2.Invoicing and Payment - www.ipp.gov 3.Part 13 - Simplified Procedures for Noncommercial Acquisitions 4.Part 36 - Construction and Architect-Engineer Contracts 5.Davis Bacon Wage Rates Cibola County (NM20260031) 6.Type of Contract, Firm Fixed Price 7.Basis of Award - Price and Other Factors (see Section M) 8.Potential offerors are responsible for monitoring this site for the release of this document and subsequent amendments.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/cdb891f857c1419ba18779875289791a/view)
 
Place of Performance
Address: Grants, NM, USA
Country: USA
 
Record
SN07911075-F 20260806/260810081816 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.