Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 06, 2026 SAM #9019
SOLICITATION NOTICE

F -- Demolition, Removal, and Remediation

Notice Date
8/4/2026 12:00:00 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
6913G6 VOLPE NATL. TRANS. SYS CNTR CAMBRIDGE MA 02142 USA
 
ZIP Code
02142
 
Solicitation Number
6913G626Q300044
 
Response Due
8/5/2026 11:00:00 AM
 
Archive Date
08/20/2026
 
Point of Contact
Regan, Roland
 
E-Mail Address
roland.regan@dot.gov
(roland.regan@dot.gov)
 
Description
The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition. The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report. The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required. Copies of the permits shall be attached to the work plan as an appendix. Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks. The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. See SOW for details.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/f336001a240144fb8537659d70accad4/view)
 
Place of Performance
Address: Glens Falls, NY 12801, USA
Zip Code: 12801
Country: USA
 
Record
SN07910795-F 20260806/260810081815 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.