Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF AUGUST 05, 2026 SAM #9018
SOURCES SOUGHT

12 -- USARC PLFS Refit & Warranty Renewal

Notice Date
8/3/2026 12:00:00 AM
 
Notice Type
Sources Sought
 
NAICS
334310 — Audio and Video Equipment Manufacturing
 
Contracting Office
W6QM MICC FDO FT BRAGG FORT BRAGG NC 28310-0000 USA
 
ZIP Code
28310-0000
 
Solicitation Number
PANMCC051878
 
Response Due
8/11/2026 9:00:00 AM
 
Archive Date
08/26/2026
 
Point of Contact
Darius T. Moore, Casey N. Cambrin
 
E-Mail Address
darius.t.moore2.civ@army.mil, casey.n.cambrin.civ@army.mil
(darius.t.moore2.civ@army.mil, casey.n.cambrin.civ@army.mil)
 
Description
The Contractor must perform the following work and meet specifications: Mobile Marksmanship Training Simulator (MMTS) � . Replace (40) LS17 Gaming Computer with newer version. . Install and upgrade (20) LS Short Throw Video Projector. . Repair (80) M4 Rechargeable PEQ. . Repair/replace (160) M4 magazine round counter. . (20) Counting Mag Charging Dock, (16Mag) . (20) Screen 14� . (40) CO2 Refill Adapters . (20) Round Trip Freight . Labor . Five-year extended warranty (15SEPT26-14SEPT31) The contractor must conduct a system survey for all 20 PLFS units to assess current hardware and operational deficiencies. The contractor must perform technology refreshes, including all necessary hardware upgrades and repairs, to bring systems to current operational standards. The contractor must provide a 5-year extended warranty for all upgraded systems, covering labor, repairs, and replacements for failures due to defective material or workmanship. The contractor must provide periodic courseware updates aligned with TC 3-22.40 Army qualification standards at no additional cost under the warranty agreement. Clean up after Servicing: The Contractor must remove all trash, debris, or surplus materials from the work site during and at the end of each workday and must leave the work site clean of all debris when work is completed. Project completion for the Project is estimated to be 30 calendar days from receipt of the Notice to Proceed (NTP), which includes travel, staging, execution, and quality assurance. Government Materials � No Government-furnished materials are provided. The Contractor is responsible for providing all equipment, materials, and PPE. The Contractor may request approval to use GSA or other Government supply sources if needed. Inspection: The Contractor must notify the Contracting Officer's Representative (COR) no later than two (2) days prior to starting work on each MMTS or major system phase. Warranties: The Contractor must provide a warranty of one (1) year on workmanship for all labor performed. Additionally, a five (5) year extended warranty will be applied to all PLFS systems covering hardware and software reliability, repair, and replacement due to defects.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/c9e4db8be1ba4fedb55eefdfd10fd880/view)
 
Place of Performance
Address: Fort Bragg, NC, USA
Country: USA
 
Record
SN07910047-F 20260805/260810081534 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.