99 -- RPC Power Factor Correction Work Package 1 - Demolition

Notice Date
7/17/2026 6:07:16 PM
 
Notice Type
Sources Sought
 
Contracting Office
SLAC Natl Accel Lab -DOE Contractor Menlo Park CA 94025 USA
 
ZIP Code
94025
 
Solicitation Number
SLAC_RFP_367094
 
Response Due
7/24/2026 10:00:00 AM
 
Archive Date
07/24/2026
 
Point of Contact
doreen agbayani
 
E-Mail Address
doreena@slac.stanford.edu
(doreena@slac.stanford.edu)
 
Small Business Set-Aside
NONE No Set aside used
 
Description
Introduction and Overview: The subcontractor must provide all labor, oversight, tools, materials, equipment, and services necessary to complete the work safely and in compliance with approved BIO documents as well as SLAC, DOE, and ES&H standards. SLAC receives power at its Master Substation (MSS) from a PG&E 230kV transmission line via two 230kV/12.47kV stepdown transformers. SLAC identifies that its AC power system encounters power factor issues at the point of connection (POC) with PG&E, where the power factor strays outside the contractual range (0.97 lag to 0.99 lead). This deviation stems from various factors, including reactive power imbalances, capacitive or inductive loads, etc. Consequently, suboptimal power factor conditions can result in increased power losses, reduced system efficiency, and involve potential penalties imposed by PG&E. To address this challenge, SLAC plans to implement power factor correction measures through the installation of two switched power factor correction (PFC) systems � one on 12.47 kV Bus-1 and another on 12.47kV Bus-2 at the Master Substation (MSS). These PFC units will dynamically improve reactive power flow, compensating for system reactive power demand, and maintaining the overall power factor within the required range. Enhancing power factor correction in this manner will optimize energy utilization, reduce system losses, and ensure continued compliance with PG&E contractual requirements. Purpose: Prior to the installation of the new power factor correction equipment, it is necessary to demolish existing buildings (B308 and B311) with equipment inside them to create adequate space within the MSS Yard. This Statement of Work outlines the scope for the demolition, disassembly, and removal of existing assets, including metal buildings B308 and B311, a non-operational synchronous condenser, and the associated electrical equipment and cabling and wiring serving the condenser. All identified buildings and equipment are located in the SLAC MSS Yard. THIS IS FOR SOURCES SOUGHT ONLY, DO NOT SUMBIT BIDS. While the draft RFP package has been included with this post, the RFP has not been released. Interested vendors should express their interest by sending their capabilities statement to Doreen Agbayani at doreena@slac.stanford.edu.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/99bbf7310e21477c91b960e33506e947/view)
 
Place of Performance
Address: Menlo Park, CA 94025, USA
Zip Code: 94025
Country: USA
 
Record
SN07890759-F 20260719/260717230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.