Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF JULY 17, 2026 SAM #8999
SOLICITATION NOTICE

P -- PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona

Notice Date
7/15/2026 9:31:47 AM
 
Notice Type
Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
W2V6 USA ENG SPT CTR HUNTSVIL REDSTONE ARSENAL AL 35898-0000 USA
 
ZIP Code
35898-0000
 
Solicitation Number
W912DY26RA107
 
Response Due
7/27/2026 7:00:00 AM
 
Archive Date
07/15/2027
 
Point of Contact
TYRONE M. BROWN, Phone: 25698951918, Christy N. Tallant, Phone: 256-895-5238
 
E-Mail Address
tyrone.m.brown@usace.army.mil, Christy.N.Tallant@usace.army.mil
(tyrone.m.brown@usace.army.mil, Christy.N.Tallant@usace.army.mil)
 
Small Business Set-Aside
WOSB Women-Owned Small Business
 
Description
The purpose of this amendment is to extend the proposal submission deadline from 15 July 2026 to 27 July 2026.PRE-DEMOLITION SURVEY VARIOUS BUILDINGS Marine Corps Air Station in Yuma, Arizona. The objective of this Performance Work Statement (PWS) is to plan and complete the environmental sampling of excess facilities at the specified installation. The structures of concern are listed in Table I. The sampling will identify and determine the extent of Asbestos-Containing Materials (ACM) and Other Regulated Materials (ORM). Additionally, the Contractor shall complete a Waste Stream Analysis for RCRA 8 metals, Lead-Based Paint (LBP), and PCBs-in-paint for those parts of the structure currently identified as potentially having painted components. Following sampling, the Contractor shall be able to characterize and quantify the environmental contamination present to the extent necessary for demolition planning and waste disposal profiling. The Contractor shall identify the methods required to abate, remove, and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with applicable Federal, State, and local regulations. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. The results of the site investigation and sampling effort will be provided in a comprehensive Pre- Demolition Assessment Report encompassing all assessed facilities. The Contractor?s proposed schedule, submitted with their proposal, shall establish the timeline for laboratory testing, analysis, and the final report submittal. The intent of this contract?s effort is to provide comprehensive sampling for all ACM/ORM materials, including the facility exterior, roof, basements, and crawl spaces. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within the structures that were not accessible during the survey, detailing the size of the area not accessed and the current or immediate previous use of the area not sampled.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/d163bbe08eee4f0cac774eb131a9a25e/view)
 
Place of Performance
Address: Yuma, AZ, USA
Country: USA
 
Record
SN07886542-F 20260717/260715230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

| FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.