Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF JULY 11, 2026 SAM #8993
SOURCES SOUGHT

A -- Water Valve Leak Mitigation

Notice Date
7/9/2026 6:05:23 AM
 
Notice Type
Sources Sought
 
NAICS
54171 — Research and Development in the Physical, Engineering, and Life SciencesT
 
Contracting Office
FLUOR MARINE PROPULSION - DOE CONTRACTOR Schenectady NY 12301 USA
 
ZIP Code
12301
 
Solicitation Number
FMP-NNL-0047
 
Response Due
9/3/2026 2:00:00 PM
 
Archive Date
09/04/2026
 
Point of Contact
ATIP
 
E-Mail Address
ATIP@unnpp.gov
(ATIP@unnpp.gov)
 
Description
THIS IS A REQUEST FOR INFORMATION ONLY. THIS IS NOT A SOLICITATION. This notice is issued solely for informational and planning purposes. This notice does not constitute a solicitation. The Naval Nuclear Laboratory (NNL), operated by Fluor Marine Propulsion (FMP), is utilizing this request for information for market research to determine what organizations have the capability to fulfill this requirement. NNL will not be responsible for any costs incurred by interested parties in responding to this request for information. Responses shall not exceed five (5) pages in length. Scope: When performing maintenance on a pure water fluid system, valves are commonly used for work area isolation. Valves that have been in-service can leak past their seats. In this case, the worker may still be protected from hazardous energy on the other side of the valve but work such as welding might not be possible if water is being continually introduced to the work area. In this case, more valves can be used if available in the system design, but if not, freeze seals are commonly used to eliminate leakage. Freeze seals can consume significant work and resources to set, so alternate means to mitigate water leakage past valves is desired. A method to mitigate valve leak-by for the hours or days a system is open for maintenance or the time to perform a weld is desired which will not affect pure water chemistry or stainless-steel corrosion or cracking performance. The method must not introduce devices or materials that require removal from the system after repair is completed. Solutions must either be external to the system, completely dissolve into known and consistent constituents at room temperature, or otherwise non-intrusive.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/baf9100654e34e4cb0b32d40f583e542/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN07880946-F 20260711/260709230051 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.