Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF JULY 09, 2026 SAM #8991
SOLICITATION NOTICE

26 -- Truck Tire Replacement

Notice Date
7/7/2026 7:45:50 AM
 
Notice Type
Solicitation
 
NAICS
811198 — All Other Automotive Repair and Maintenance
 
Contracting Office
NATIONAL CONTINUITY SECTION(CON50) BERRYVILLE VA 22611 USA
 
ZIP Code
22611
 
Solicitation Number
WX01143Y2026T
 
Response Due
7/13/2026 8:00:00 AM
 
Archive Date
07/28/2026
 
Point of Contact
Christopher L. Barrow, Phone: 5405425935
 
E-Mail Address
christopher.barrow@fema.dhs.gov
(christopher.barrow@fema.dhs.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This requirement will be evaluated on lowest price technically acceptable and is for the procurement and replacement of truck tires. Please provide a price quote for the details shown in the attached statement of work to include installation. Please provide a GSA contract number if you have one. The tires must be procured and installed 90 days from date of award of contract. If you cannot meet this timeline, provide a justification. Tires must be 2026 year and vendor must be within 30 miles of installation site. ***TIRES MUST BE REPLACED AT THE FACILTY LOCATED AT: FEMA MERS 434 S. PINETREE BLVD. THOMASVILLE, GA 31792 *** SEE STATEMENT OF WORK AND ITEM LIST*** Q1. Please provide the list of vehicles requiring tire replacement under each project. A1. Disclosure of the types of vehicles or quantity is not to be disclosed. Q2. What tire sizes are required for the vehicles covered under these requirements? A2. Tire specifications are listed in the attached Statement of Work. Q3. What are the vehicle specifications, including the sizes/types of trucks in A3. Requested tires are listed in the Statement of Work. Q4. Please confirm the total fleet size, including the number of trucks and trailers covered under each requirement. A4. Disclosure of the types of vehicles or quantity is not to be disclosed. Requested tires are listed in the Statement of Work. Q5. Does the 90-day period of performance include both the procurement of the tires and the completion of all tire replacement services for each project? A5. Yes Q6. Please clarify whether the contractor is responsible for the removal, disposal, and cleanup of the old tires, or if this will be handled by the Government. A6. Yes the contractor is responsible for all removal and cleanup. Q7. Kindly confirm the appropriate email address for the Point of Contact (POC) to whom quotations should be submitted for this requirement. A7. paul.johnson@fema.dhs.gov
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/dc72a0a966b34f80a55cd068e6bbc4b5/view)
 
Place of Performance
Address: Thomasville, GA 31792, USA
Zip Code: 31792
Country: USA
 
Record
SN07876447-F 20260709/260707230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.