Loren Data's SAM Daily™

fbodaily.com
SAMDAILY.US - ISSUE OF JULY 09, 2026 SAM #8991
SOLICITATION NOTICE

S -- Upper Baker Installing Trailer Pads and Utilities

Notice Date
7/7/2026 8:10:31 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Manti-Lasal National Forest PRICE UT 84501 USA
 
ZIP Code
84501
 
Solicitation Number
1240LT26Q0126
 
Response Due
8/10/2026 4:00:00 PM
 
Archive Date
08/25/2026
 
Point of Contact
Derrick A Dodson, Jaren McCourt
 
E-Mail Address
derrick.dodson@usda.gov, Jaren.mccourt@usda.gov
(derrick.dodson@usda.gov, Jaren.mccourt@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code. Utilities � Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2� poly line. New water line will be a 2� HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection. Sewer � The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6� with trailer connections being 6� to 3� Wye�s. Drainage must remain between 1/8� � �� per ft across the entirety of the line. Must meet state code. Electrical � A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code. Option Items � Trenching and Backfilling � Trenching will need to be 36� deep to meet frost line requirements. Crushed Aggregate � Grade G Road Base for the trailer pads and roadway
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/951967d44bd44757925a825597357cf3/view)
 
Place of Performance
Address: Monticello, UT 84535, USA
Zip Code: 84535
Country: USA
 
Record
SN07876142-F 20260709/260707230048 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.