Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 13, 2026 SAM #8934
SOURCES SOUGHT

99 -- RMCD ROAR 2

Notice Date
5/11/2026 5:33:33 AM
 
Notice Type
Sources Sought
 
Contracting Office
FA8525 AFLCMC WLSKA ROBINS AFB GA 31098-1670 USA
 
ZIP Code
31098-1670
 
Solicitation Number
FA8525-26-RMCDROAR2
 
Response Due
5/26/2026 1:00:00 PM
 
Archive Date
06/10/2026
 
Point of Contact
Maria George, Myoshe Johnson
 
E-Mail Address
maria.george.1@us.af.mil, myoshe.johnson@us.af.mil
(maria.george.1@us.af.mil, myoshe.johnson@us.af.mil)
 
Description
C-5M Replacement Multi-Functional Controls and Displays (RMCD) Program Request for Information The Government is conducting market research to identify possible sources that have the knowledge and experience to deliver a hardware and software system solution to perform all the functions of the legacy Multi-Function Display Units (MFDUs) classified as the C-5M Replacement Multi-Functional Controls and Displays (RMCD) program. This new solution will resolve known diminishing manufacturing source issues with this Line Replaceable Unit (LRU), avoid projected aircraft Mission Incapable for Parts-based grounding issues, and improve overall aircraft availability metrics. This effort would require up to a Secret security clearance. The Contractor shall ensure that their solution conforms to applicable military and aviation standards to ultimately gain military airworthiness certification upon integration onto the aircraft. The Contractor shall prioritize the use of the Modular Open Systems Approach (MOSA). The Contractor shall provide sufficient system quantities to support integration activity at both Contractor and Government Systems Integration Laboratories (SIL) as well as to support follow-on prototype installations and subsequent ground and flight testing. The Contractor shall provide a product baseline to include documentation describing all of the physical characteristics of their C-5M RMCD design and configuration items and the physical characteristics designated for pre-production acceptance testing, as well as product support documentation necessary for installation, test, operation, support, training, and disposal of the configuration items. The EMD-approved product baseline includes �build-to� specifications for hardware (e.g., product, process, material specifications, engineering drawings, and other related data) and software. It is noted that the software development will proceed according to an agile at scale framework (e.g. SAFe) whose incremental approach does not follow the traditional waterfall milestone progression. The Contractor shall furnish all material, support equipment, tools, test equipment, and services. The Contractor is responsible for providing, maintaining, and calibrating all support equipment required at their facility or a subcontractor�s facility. Contractor-furnished material or parts used for replacement shall equal or exceed the quality of the original material or parts. Contractors/Institutions responding to this market research are placed on notice that participation in this survey may not ensure participation in future solicitations or contract awards. The Government will not reimburse participants for any expenses associated with their participation in this survey.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/ac911437f81d4fbfa668d360b7af99fc/view)
 
Place of Performance
Address: Marietta, GA 30063, USA
Zip Code: 30063
Country: USA
 
Record
SN07811309-F 20260513/260511230046 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.