Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 13, 2026 SAM #8934
SOLICITATION NOTICE

14 -- Wings & Fins Subassemblies

Notice Date
5/11/2026 10:29:23 AM
 
Notice Type
Solicitation
 
NAICS
336419 — Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
FA8556 AFLCMC EBUK ROBINS AFB GA 31098-1811 USA
 
ZIP Code
31098-1811
 
Solicitation Number
FA855626RB013
 
Response Due
6/1/2026 12:30:00 PM
 
Archive Date
06/16/2026
 
Point of Contact
Dillan Harper-Smith, Ivan Jones, Phone: 4783275756
 
E-Mail Address
dillan.harper-smith.1@us.af.mil, ivan.jones.2@us.af.mil
(dillan.harper-smith.1@us.af.mil, ivan.jones.2@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This notice serves as a formal SOLICITATION for the procurement of Wing and Fin Sub-Assemblies. These critical sub-components are required to support the AIM-120X and CATM-120X series of the Advanced Medium Range Air-to-Air Missile (AMRAAM). The Government intends to award a single contract for the scope of work identified within the Attachment 2 Statement of Work (SOW) as a result of this solicitation. 2. Source Selection Procedures This acquisition will utilize the Lowest Price, Technically Acceptable (LPTA) source selection procedure in accordance with: FAR 15.103-2 DoD Source Selection Procedures referenced in DFARS 215.200 and DFARS PGI 215.200 These procedures will be used to make an integrated assessment for a best value award decision. Please refer to sections L and M of the solicitation for additional information. 3. Evaluation and Award Criteria The Government shall evaluate proposals in accordance with the provisions outlined in this notice. A detailed and complete analysis of each offeror's proposal will be performed. Key Evaluation Parameters: Proposal Limit: The Government will only evaluate one proposal from each offeror. Award Basis: Award will be made to the responsible offeror whose proposal: Is determined to be technically acceptable. Conforms to all solicitation requirements (terms and conditions, representations, certifications, and technical requirements). Has the lowest Total Evaluated Price among the technically acceptable offerors. Evaluation Sequence: The Government does not imply, nor is it the Government's intention, to conduct the evaluations in sequential order (i.e., technical evaluation does not necessarily have to precede price evaluation). 4. Technical Evaluation Factors The Government's technical evaluation will be based on the following four equally important subfactors: Subfactor Description Subfactor One Wing and Fin Packaging, Handling, Shipping and Transportation Solution Subfactor Two Wing and Fin Production Plan Subfactor Three Finished/In Process Product Verification Plan Subfactor Four Honeycomb Implementation _______________________________________________________________________________________________ Questions Received: 1. The First Article timeline indicates up to 720 days (without a waiver), while the first item delivery appears to be required within approximately 365 days. Can you please clarify the Government's expection regarding this timeline? Specifically: Is the intent that the first Delivery Order (DO1) would not be issued until after First Article approval (potentially up to 720 days from contract award), which would push DO1 delivery into the 2029 timeframe? Or is there an alternate expectation involving the delivery of two (2) First Article units and concurrent qualification activities that would support earlier production and delivery? 2. Drawing package is quite old and has many areas of poor clarity and blurred details essential for the evaluation and manufacturing design. 3. Since the drawings are only scanned copies of printed drawings, the effort will require modeling and digitization of the information to permit modern CNC machining instruction protocols. Is NRE allowed in proposal submissions or are vendors expected to to take on those costs and distribute in the delivered units pricings? Alternately are digital models of the components available for industry evaluation? 4. Brazing of the metallic honeycomb - lcaks details on the processes to satisfactorily meet the standards, with no deviations permitted. Is the Govt open to sharing best practices from prior manufacturing of the Wings/Fins to facilitate successful first article builds? 5. Partial bids - would a proposal of the metal part manufacture be acceptable to the Government in the event that honeycomb brazing processess cannot be achieved in an acceptable standard? 1. Answer: The Government estimates that production of the two (2) First Article units will require six (6) to twelve (12) months, followed by an additional six (6) to twelve (12) monhts for First Article Testing (FAT) prior to full-rate production. Therefore, the Goverment anticipates mass delivery to occur in 2029, contingent upon successful FAT and validation of a viable product. 2. Answer: Please be specific as to blurred details on given drawings; drawing number, drawing zone, and specific questions. The drawings are the best copies available. 3. Answer: Vendors are expected to take on the costs of any NRE and distribute that pricing as necessary within the delivered units' pricing. The Government does not possess digital models of the wings and fins. The method of manufacture is up to the supplier, as the Government expects a finished product per the drawings and related specifications. 4. Answer: The drawings specify MIL-B-7883 Type II (furnace Brazing) and Class A (Critical structure), which has been superseded by AWS C3.6, but MIL-B-7883 should control. The drawings also have several evaluations of the quality of the brazing operations in the notes. The Government will not provide training nor best practices. The Government expects delivered items to match the drawings and its relevant specifications. 5. Answer: The Government is only interested in the honeycomb brazing and will not allow for a partial bid in accordance with solicitation FA8556-26-R-B013. ____________________________________________________________________________________________________ Government Actions: Drawings located under Notice ID: FA8556-25-R-B016 will now be added to this notice to avoid having to request access to an older annoucement. Drawings are separate from the solicitation and will not be made as an attachment. Please contact Ivan Jones for any questions, comments, and or concerns.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/6ed8577934d643dbb687454fbdb128a6/view)
 
Place of Performance
Address: Warner Robins, GA 31098, USA
Zip Code: 31098
Country: USA
 
Record
SN07810538-F 20260513/260511230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.