Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 07, 2026 SAM #8928
SOLICITATION NOTICE

S -- Retention Pond Vegetation Removal

Notice Date
5/5/2026 7:50:16 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
561730 — Landscaping Services
 
Contracting Office
USDA ARS AFM APD BELTSVILLE MD 20705 USA
 
ZIP Code
20705
 
Solicitation Number
1232SA26Q0567
 
Response Due
5/22/2026 2:00:00 PM
 
Archive Date
06/06/2026
 
Point of Contact
lynn Hults, Phone: 9124649723
 
E-Mail Address
lynn.hults@usda.gov
(lynn.hults@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This project is to Remove Vegetation from the Retention Pond at the USDA, ARS, Gainesville, FL location. Please review the attached documents for the required information. Please sent you r quotes directly to the email Point of Contact in this solicitaion. A site visit has been scheduled for Wednesday May 13, 2026, at 8:00 am EST. If you would like to attend, please send the name of the personnel requesting to attend with the name of the compnay which they are representing to lynn.hults@usda.gov by 2:00 pm CST Tuesday May 12, 2026. Questions and Answers. Q1: Overhead and street views indicate a need to get the surrounding shoreline cleaned up in order to gain access to the retention pond. We have equipment for that, but the steepness of the bank would dictate the use of either a track loader or an excavator to facilitate the job. Would this bid require debris removal to a landfill? A1: A tracked excavator will be necessary to preform the work required. The requirements are as follows. Removal of all vegetation in retention pond Removal of specified trees and vegetation immediately around retention pond Wet debris may be piled for removal after drying All debris will either be hauled off site or mulched on site Q2: Would we be able to leave equipment and trailers at the job site? A2: Equipment can be left on site during the prefomance of contractual work. Q3: Is there any special permitting required? A3: No special permitting is required on site. DOT may regulate the transportation of wet debris. Q4: What is the approximate pond size (acreage and depth)? A4: 150� in diameter and 8� below surrounding grade at bottom. These are NOT actual dimensions but estimates. Q5: Are stumps required to be removed as part of tree clearing? A5: Yes, stumps are to be removed. Q6: Are there any environmental restrictions or permits required for this work? A6: No permits are required on site for this work to our knowledge. Q7: Is there a preferred debris disposal method (mulching on-site vs. hauling off-site)? A7: No preferred method. The area is to be left tidy with no piles of debris at job completion. Q8: Are there any site access limitations we should plan for? A8: No. Q9: What is the required completion timeframe for the project? A9: 4 weeks from start of work.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/f91b7fdc1b2246919443343685e5cef3/view)
 
Place of Performance
Address: Gainesville, FL 32608, USA
Zip Code: 32608
Country: USA
 
Record
SN07802429-F 20260507/260505230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.