Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 02, 2026 SAM #8923
SOLICITATION NOTICE

J -- USCGC Alder Cargo Hatch Welding

Notice Date
4/30/2026 9:55:08 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70z08526Q0024676
 
Response Due
5/11/2026 8:00:00 AM
 
Archive Date
05/26/2026
 
Point of Contact
Lindsay Mongiovi, Phone: 5716086752, Justin Wooldridge, Phone: 2068205327
 
E-Mail Address
lindsay.n.mongiovi@uscg.mil, justin.r.wooldridge2@uscg.mil
(lindsay.n.mongiovi@uscg.mil, justin.r.wooldridge2@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Statement of Work USCGC ALDER (WLB 216) Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew 1. Purpose and Scope . KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping located in compartment 2-30-0-AA, Cargo Hold. 2. Deliverables and Performance Requirements . Protective measures: The KTR must furnish and install all protective measures IAW SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). . Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000, (Interferences). . Contamination prevention: The KTR must take all precautions to prevent contamination of personnel and spaces IAW all applicable Federal, state, and local regulations. . Fluid handling: The KTR must remove and dispose of removed fluids from the affected piping system, IAW all applicable Federal, state, and local regulations. Do not drain any fluids into any spaced, bilge, or exterior location. . Piping renewal particulars: The KTR must accomplish the following tasks, using Coast Guard Drawing 225�WLB�528�001, REV K as guidance: o Crop out necessary length of piping (3� & 2� diameter), to include all necessary funnel pieces of the cofferdam system. o Fabricate necessary piping arrangement previously cropped IAW CG Drawing. o Install all fabricated piping to include all required gaskets/seals IAW CG Drawing. o KTR must provide a means of sealing any open piping while any portion of the system is open (i.e.: upstream valve blind flange). . Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary. . Pipe labeling: The KTR must label affected piping as follows: o Name of the piping system service. o Destination, where feasible. o Direction of flow, indicated by an arrow three inches long pointing away from the lettering. . Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the Contractor must test the affected piping system's operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. . Touch-up preservation: The KTR must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.) . Piping insulation installation: The KTR must install new insulation materials over the exposed pipe surfaces at thicknesses appropriate to the application and temperature ranges specified in ASTM F683 Tables.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/6b6676b2d9c540c19a86465f50635c2e/view)
 
Place of Performance
Address: San Francisco, CA 94130, USA
Zip Code: 94130
Country: USA
 
Record
SN07797608-F 20260502/260430230037 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.