Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 30, 2026 SAM #8921
SOLICITATION NOTICE

Z -- Parking Garage (Building 213) Maintenance and Repairs MTH VAMC

Notice Date
4/28/2026 7:31:04 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
249-NETWORK CONTRACT OFFICE 9 (36C249) MURFREESBORO TN 37129 USA
 
ZIP Code
37129
 
Solicitation Number
36C24926Q0173
 
Response Due
4/30/2026 9:00:00 AM
 
Archive Date
05/30/2026
 
Point of Contact
diane.ziegler@va.gov, Diane Ziegler, Phone: 615-225-6479
 
E-Mail Address
diane.ziegler@va.gov
(diane.ziegler@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business Set Aside
 
Awardee
null
 
Description
Q & A RFQ 36C24926Q0173 Q: Inquiring to see if there is going to be a site-walk visit? A: Yes, if requested. Q: We would like to submit questions in relation of the scope. See below: Is power washing required monthly, quarterly, or only as needed? Is re-striping expected annually, as needed, or included in the monthly service price? Should the contractor assume full re-striping each cycle or only touch-up of faded markings? How many weld repairs are anticipated annually? The SOW species Weld Repairs (each) how is a single repair defined (LF, location, or connection)? Will a pre-bid site visit be scheduled to assess current condition of the parking garage? A: Cleaning shall be conducted biannually, specifically post-winter season and pre-winter season. The scheduling will be coordinated with the selected contractor. The request for painting services is for once a year. It is anticipated that the coating will maintain its integrity for a minimum of one year; failure to do so will necessitate the contractor performing all applicable touch-up procedures at no additional cost. The scope of work entails repairing one of the connection joints between the panels, comprising ten pre-installed stainless steel plates arranged at designated intervals along the joint. After welding, the joint must be sealed with an approved silicone sealant to safeguard the plates from environmental damage; the proposed silicone product must be submitted for formal approval prior to application. The scope of work entails repairing one of the connection joints between the panels, comprising ten pre-installed stainless steel plates arranged at designated intervals along the joint. Yes, if requested.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/716ae3de4cb84fd18ff7e322cbd12026/view)
 
Record
SN07794343-F 20260430/260428230039 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.