Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 19, 2026 SAM #8910
SOURCES SOUGHT

Z -- Sources Sought - Brunswick Harbor Modifications Project, Glynn County, GA.

Notice Date
4/17/2026 7:06:49 AM
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W074 ENDIST SAVANNAH SAVANNAH GA 31401-3604 USA
 
ZIP Code
31401-3604
 
Solicitation Number
W912HN26BA009
 
Response Due
4/23/2026 12:00:00 PM
 
Archive Date
05/08/2026
 
Point of Contact
Rohan Bryan, Phone: 9126525619, Chad A. Arnett, Phone: 9126525088, Fax: 9126525828
 
E-Mail Address
rohan.a.bryan@usace.army.mil, chad.a.arnett@usace.army.mil
(rohan.a.bryan@usace.army.mil, chad.a.arnett@usace.army.mil)
 
Description
The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform Brunswick Harbor Modifications Project located in Glynn County, GA. This request does not obligate the Government in any way to post a solicitation or award a contract. Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS is 237990 with a size 37 million. The potential magnitude for this requirement, per DFARS 236.204(i), is estimated between $10,000,000 and $25,000,000 dollars. Inquiry will only be accepted via email to Contract Specialist, Mr. Rohan Bryan at rohan.a.bryan@usace.army.mil, or Contracting Officer, Mr. Chad Arnett at chad.a.arnett@usace.army.mil. The request for Information Sheet should be completed and submitted no later than April 23, 2026, at 3:00 pm, Eastern Standard Time (EST). THIS IS NOT A SOLICITATION. THIS POSTING IS A SOURCES SOUGHT NOTICE ONLY. The scope of work includes the expansion of the Cedar Hammock Range bend widener located between stations 20+300 and 23+300. The bend widener is expected to be expanded by a maximum of 321 feet on the north side and to a length of approximately 2,700 feet. The bend widener will be dredged to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 205,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed on a Beneficial Use site at Jekyll Island. Additionally, the scope of work also includes the expansion of the turning basin at Colonel�s Island Terminal along approximately 4,100 feet, which will increase the width by a maximum of 395 feet along the South Brunswick River from stations 0+900 to 5+300 and to a depth of -38 feet (-36 feet plus 2 feet of allowable overdepth dredging). Approximately 346,000 cubic yards of dredged material is anticipated to be removed to expand the bend widener and placed at the Andrew�s Island DMCA.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/fec757a3b6594753809531fe6ba327ff/view)
 
Place of Performance
Address: Brunswick, GA, USA
Country: USA
 
Record
SN07783481-F 20260419/260417230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.