Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 12, 2026 SAM #8903
SOLICITATION NOTICE

F -- FAA Western & Central Facility Demolition, Removal and Restoration

Notice Date
4/10/2026 4:28:36 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
6913G6 VOLPE NATL. TRANS. SYS CNTR CAMBRIDGE MA 02142 USA
 
ZIP Code
02142
 
Solicitation Number
6913G626R200004
 
Response Due
5/5/2026 10:00:00 AM
 
Archive Date
05/12/2026
 
Point of Contact
Roland Regan, Phone: No phone calls.
 
E-Mail Address
roland.regan@dot.gov
(roland.regan@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The FAA no longer uses the equipment/buildings at the above-listed facilities. If the property is leased and there are no co-located facilities, the FAA will typically cancel the leases after the demolition and restoration activities take place. If the property is government-owned, the FAA will either sell the property or repurpose it for further government use. Prior to relinquishing these properties the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. The DEN TANK is co-located at an active FAA facility complex and only the former tank and related infrastructure is being removed from the property. TASKS TO BE PERFORMED The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirement. Demolition, Remediation/Removal, and Restoration Work Plan The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition. The contractor shall remove and/or demolish on-site structures and infrastructure in accordance with the procedures detailed in the site survey reports and the approved Final Work Plans. The contractor shall obtain all necessary local, state and federal permits for demolition work, complete any required paperwork, and pay any applicable fees unless otherwise discussed with the Government. These permits shall be submitted as an appendix to the work plan unless previously discussed with the Volpe Center. Asbestos, lead-based paint (LBP) and PCB in building materials surveys were completed by licensed inspectors. The results are included as government furnished information (GFI). No asbestos-containing materials (ACM) were found at all three FAA facilities. Lead was not found in the soil above the FAA action level of 200 mg/kg at RVS and TJY OMs. LBP was not found on building materials, however, the orange-painted OM antennas at RVS and TJY were not sampled, and based on similar FAA projects, are presumed to contain LBP and shall be disposed as such. (SEE SOLICITATION for details)
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/82d371b67ced40d9bc064fa054e3387b/view)
 
Place of Performance
Address: Tulsa, OK 74133, USA
Zip Code: 74133
Country: USA
 
Record
SN07775559-F 20260412/260410230041 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2026, Loren Data Corp.