Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JANUARY 10, 2026 SAM #8811
SOLICITATION NOTICE

Z -- 36C249-26-AP-1126 - SPS Flooring - Engineering

Notice Date
1/8/2026 1:56:53 PM
 
Notice Type
Presolicitation
 
NAICS
238330 — Flooring Contractors
 
Contracting Office
249-NETWORK CONTRACT OFFICE 9 (36C249) MURFREESBORO TN 37129 USA
 
ZIP Code
37129
 
Solicitation Number
36C24926Q0076
 
Response Due
1/23/2026 3:00:00 PM
 
Archive Date
02/07/2026
 
Point of Contact
Shania Kimbrough, Contract Specialist
 
E-Mail Address
shania.kimbrough@va.gov
(shania.kimbrough@va.gov)
 
Small Business Set-Aside
SDVOSBC Service-Disabled Veteran-Owned Small Business Set Aside
 
Awardee
null
 
Description
THIS IS A PRESOLICITATION NOTICE The Department of Veterans Affairs, Network Contracting Office 9, located at 1639 Medical Center Parkway, Suite 204, Murfreesboro, TN, 37129, anticipates issuing a solicitation Request for Quotation (RFQ) on or about 01/12/2026 for epoxy floor repair service for the Sterile processing service located at the TVHS VAMC in Nashville TN. This notice fulfills the requirement listed in accordance with the Revolutionary FAR Overhaul (RFO) FAR part 12.201-1(c)(2) procedures. SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS Code: 238330 (Flooring Contractors) SBA SIZE STANDARD: $19.0 M PSC: Z1DA (maintenance of hospitals and infirmaries) DESCRIPTION: This requirement is for the Nashville, TN Veterans Affairs Medical Center located at the addresses listed below: TVHS VAMC 1310 24th Ave. South Nashville, TN REFER TO ATTACHED SOW AND PHOTOGRAPHS FOR ADDITIONAL INFORMATION PERIOD OF PERFORMANCE: The project is expected to be completed within 30 days of contract award. **A site visit will be offered to any interested vendor wishing to attend. The information will be posted in the actual solicitation. There will be at least one week from the posting date of the solicitation until the site visit to allow for travel preparations. IMPORTANT NOTICE: VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: (i) [SUBCONTRACTING LIMITATIONS] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) [SUBCONTRACTING LIMITATIONS CON)] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) [ISUBCONTRACTING LIMITATIONS] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating 18 U.S.C. 1001. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: ___________ Printed Title of Signee: _____________ Signature: ____________ Date: ______________ Company Name and Address: _______________ STATEMENT OF WORK GENERAL INFORMATION Title of Project: SPS epoxy floor repair Scope of Work: This requirement is to remove the damaged flooring sections from crack to crack in the affected areas of SPS flooring areas (See Pictures). The site would need to be prepped for the remaining concrete slabs for reinstallation of affected areas. Use a leveling compound to correct the imperfections and blend color (gray shade) into existing floor color (can be determined in site visit). Then apply two-part epoxy floor covering that will hold up to moisture and chemical spills. Cove inch should be 6-inches in height. Approximate 150 square footage of affected areas throughout the room, not including tying in the repair work. Contractors will be required to report to Contracting Officer Representative (COR) John Messer. Work will be scheduled after hours preferably over weekend at the Tennessee Valley Healthcare System (TVHS), for the Nashville campus located at 1310 24th Avenue South, Nashville, TN 37212. Period of performance: Work is to be completed 30 days from award. This work will be scheduled after hours or at the weekend. If space is occupied between the hours of 8:00 a.m. and 5:00 p.m. to minimize the impact on patients and VA operations. Normal hours are Monday Friday 0700-1600, any hours outside of that are considered afterhours. Hours to be scheduled with the COR. I CONTRACT AWARD MEETING The contractor shall not commence performance on the tasks in this Statement of Work (SOW) until the Service POC John Messer has conducted a kickoff meeting or has advised the contractor that a kickoff meeting is waived. GENERAL REQUIREMENTS Work Requirements Initial Project Meeting. Site work will commence with a meeting with the Maintenance Supervisor, John Messer (615-873-6893). The purpose of this meeting will serve to address time and scope of work of removal, prep, and installation of the SPS Flooring. SPECIFIC MANDATORY TASKS AND ASSOCIATED DELIVERABLES Contractor Furnished Materials: The contractor shall provide All labor, materials, equipment to perform the job. When ""furnish"", ""provide"", ""install"", or similar term is used it shall mean a complete installation, ready for use. Government Furnished Materials and Services. Government furnished property, if any, will be identified and will only be used for the performance of this contract unless otherwise authorized by the Contracting Officer. The Contractor shall, always, take all steps necessary for maintenance and preservation of all Government-furnished property. The Contractor shall comply with all reasonable requests of the Contracting Officer to enclose, or specifically protect, Government-furnished property. Qualifications of Key Personnel. The Contractor s employees should be knowledgeable of standards associated with temperature monitoring, support, and maintenance. Supervision/Communications. At all times during the performance, the Contractor's Superintendent (if applicable) shall be available by cellular phone. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent. The Contractor's ""Competent Person"" that meets OSHA training guidelines, can make decisions and acting on behalf of the Contractor shall be physically always located on site during performance of the contract. If the Contractor's Competent Person is absent from the job site for an extended period, the COR may send all Contractor/sub-contractor employees off the job. Security Requirements. Contractor shall identify which employees will be working under the awarded contract. Contractor personnel shall include employees, sub-contractors, subcontractor employees, suppliers and delivery personnel entering the Medical Center. This does not apply to suppliers and delivery personnel making deliveries to the VA warehouse dock only. Those employees shall bring photo ID to obtain a VA Contractor identification badge that shall be always worn above the belt while on Medical Center property. Contractor's employees shall return all I.D. badges to designated personnel at time designated in the task order. The Contracting Officer's Representative (COR) is responsible for the inspection of the work called for in this job. The Contracting Officer's Representative will be identified in the task order by name, telephone number and location. Inspections made by the COR are for the sole benefit of the Government and do not relieve the Contractor of any quality control responsibilities. The Safety Manger is responsible for safety inspections of all contract operations. The Safety Manager will be identified in the task order by name, phone number and location. Drawings General. Contract drawings (if applicable) will indicate the extent and location of work. If any departure from the contract drawings is deemed necessary by the Contractor, the details of such departure and the reasons therefore shall be submitted to the Contracting Officer for approval as soon as practical. No such departure shall be made without proper written permission of the Contracting Officer. The Contractor is responsible for all information and requirements in drawings and specifications that pertain to the task order. Verification of Dimensions. The Contractor shall visit the job site to thoroughly familiarize himself with all the details of the work and working conditions. The Contractor shall also verify all dimensions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. The Contractor shall be specifically responsible for the coordination and proper relation of his work to the building, structure, phasing and ensure the safety of employees and workmen. Smoking Policy. The Contractor shall not allow smoking in any building. The Contractor shall ensure employees smoke only in designated outdoor areas, 50 feet away from buildings. Parking/Traffic Regulations. The Contractor shall not park on grassy areas unless approved by the COR and the Contractor agrees to restore areas back to VA standards. Drivers should be particularly concerned with pedestrian traffic. Yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be always observed by operators. Seat belt use is mandatory on the VA grounds. There are no reserved parking spots for contractors at this VA hospital. The contractor is responsible for making their own parking plans off VA site. They may park only long enough on site, to load and unload supplies. The Contractor shall always keep the work area, including any areas where materials/equipment is being stored, free from accumulations of waste materials. The COR will designate a contractor staging area due to space limitations. The contractor is responsible for disposing all waste. Upon completion of a segment of work, the Contractor shall demonstrate to the COR that the work is complete, and the system is working. SCHEDULE FOR DELIVERABLES None. CHANGES TO STATEMENT OF WORK Any changes to this SOW shall be authorized and approved only through written modifications to the contract by the CO. A copy of each modification will be kept in a project folder along with all other products of the project. Costs incurred by the contractor through the actions of parties other than the CO shall be borne by the contractor. REPORTING REQUIREMENTS Upon arrival, every day during removal and installation, upon checkout. TRAVEL [If applicable] None. GOVERNMENT RESPONSIBILITIES [If applicable] None. CONTRACTOR EXPERIENCE REQUIREMENTS The contractor must inform the VHA COR when personnel are removed from the contract for any reason. If a key person becomes unavailable to complete the contract, proposed substitutions of key personnel shall be made to the COR and CO. CONFIDENTIALITY AND NONDISCLOSURE It is agreed that: The preliminary and final deliverables, and all associated working papers, application source code, and other material deemed relevant by VA which have been generated by the contractor in the performance of this contract, are the exclusive property of the U.S. Government and shall be submitted to the CO at the conclusion of the contract. The CO will be the sole authorized official to release, verbally or in writing, any data, draft deliverables, final deliverables, or any other written or printed materials pertaining to this contract. No information shall be released by the contractor. Any request for information relating to this contract, presented to the contractor, shall be submitted to the CO for response. Press releases, marketing material, or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO. ATTACHMENTS
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/262a7020b09f46069fa92f2e9fbf44d8/view)
 
Place of Performance
Address: Nashville VA Hospital 1310 24th Ave. South, Nashville, TN 37212, USA
Zip Code: 37212
Country: USA
 
Record
SN07681061-F 20260110/260108230038 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.