Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 26, 2025 SAM #8705
SOLICITATION NOTICE

Y -- NV FTBL 1094(1) Wilson Campground Road

Notice Date
9/24/2025 8:23:35 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF25B000025
 
Archive Date
10/24/2025
 
Point of Contact
Denise Martinez, Leslie Karsten
 
E-Mail Address
cflacquisitions@dot.gov, cflacquisitions@dot.gov
(cflacquisitions@dot.gov, cflacquisitions@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE COMPETITION: TOTAL SMALL BUSINESS SET-ASIDE PROJECT NUMBER: NV FTBL 1094(1) PROJECT NAME: WILSON CAMPGROUND ROAD PROJECT DESCRIPTION: The Wilson Campground Road Project is located along Wilson Campground Road, 83 miles northwest of Elko, Nevada. The road is located completely within theBureau of Land Management (BLM) Wilson Reservoir Recreation Management Area and is primarily used to access the Wilson Campground Recreation Area on thenorth end of the project. The need for the project is to improve safety, increase visitor usage, and enhance the driving experience. SCOPE OF THE WORK: Wilson Campground Road project is comprised of a 7.23-mile aggregate surfaced road along Wilson Campground Road. The proposed improvements as part of this project include resurfacing the existing roads, site distance improvements including an alignment shift along an existing S-curve area, cattle guard adjustments, drainage improvements, minor bridge repairs, and signing replacements. Based on available funding and construction cost analyzed during the scoping phase, the project has been broken into a schedule (Schedule A) and an option(Option X). Schedule A consists of resurfacing the 6.21 miles of aggregate road leading towards the campground facilities, multiple hydraulic improvements, and the S curve area improvements. Option X consists of resurfacing the 1.01 miles of aggregate road leading towards the campground facilities, minor bridge repairs, and multiple hydraulic improvements. PRINCIPAL WORK ITEMS: 20101-0000 Clearing and Grubbing: 14.4 ACRE 20402-0000 Subexcavation: 600 CUYD 30110-0000 Aggregate Surface Course: 22,200 TON 30301-4000 Roadbed Reconditioning: 6.940 MILE 57501-0000 Minor Bridge Work: LPSM 60202-0400 24-INCH Equivalent Diameter Arch or Elliptical Pipe Culvert: 520 LNFT 62407-0000 Placing Conserved Topsoil: 4,500 CUYD 63501-0000 Temporary Traffic Control: LPSM ANTICIPATED SCHEDULE: Advertisement � October 2025 Award � December 2025 NTP � December 2025 Contract Completion � November 2026 DISCLOURE OF MAGNITUDE: Between $5,000,000 and $10,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/workspace/contract/opp/96d4cfc6886046df90218c074bdc2246/view)
 
Place of Performance
Address: Elko, NV, USA
Country: USA
 
Record
SN07602888-F 20250926/250924230045 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.