SOLICITATION NOTICE
Y -- CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair
- Notice Date
- 4/24/2025 10:39:03 AM
- Notice Type
- Presolicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- CUSTER GALLATIN NATIONAL FOREST BOZEMAN MT 59715 USA
- ZIP Code
- 59715
- Solicitation Number
- 1240LU25R0009
- Archive Date
- 12/31/2025
- Point of Contact
- Alisha Knaub, Phone: 4064382981
- E-Mail Address
-
alisha.knaub@usda.gov
(alisha.knaub@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This is a PRESOLICITATION announcement. The solicitation is anticipated to be posted to Contract Opportunities on SAM.gov on or around May 8, 2025 PROJECT DESCRIPTION: Hand construct a total of approximately 560 feet of new 72� wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. Work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. New construction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock. Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72� full bench trail, and remove excess material from the backslope and hillside above the trail. Use of rock drills, jack hammers, rock bars and picks will be necessary as well. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards. PROJECT LOCATION: The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project. PERIOD OF PERFORMANCE: It is estimated that work can begin around July 1, 2025 for trail restoration work and remaining work to be completed in the 2026 field season with final project completion by October 15, 2026. Or the full project can be performed from June 15, 2025 to October 15, 2025. Blasting shall only occur during one season. MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000. BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee. This announcement serves as the Pre-Solicitation notice only. Responses to this synopsis are not required.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/3a960bbe5c6742b7880b5ac6cdc43f8a/view)
- Place of Performance
- Address: MT, USA
- Country: USA
- Country: USA
- Record
- SN07420248-F 20250426/250424230047 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |