Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 23, 2025 SAM #8549
SOLICITATION NOTICE

43 -- Compressor and hose

Notice Date
4/21/2025 8:51:11 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
333912 — Air and Gas Compressor Manufacturing
 
Contracting Office
NAVSUP FLT LOG CTR NORFOLK NORFOLK VA 23511-3392 USA
 
ZIP Code
23511-3392
 
Solicitation Number
N0018925Q0248
 
Response Due
4/29/2025 8:00:00 AM
 
Archive Date
05/14/2025
 
Point of Contact
Elysia Allen
 
E-Mail Address
elysia.m.allen2.civ@us.navy.mil
(elysia.m.allen2.civ@us.navy.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Pursuant to the authority at FAR 12.603(c)(2): (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. (ii) The solicitation number for this is N0018925Q0248 and will be issued as a request for quotation (RFQ). (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-03. (iv) The Government intends to negotiate a firm-fixed-price (FFP) purchase order for supplies. The associated NAICS code is 333912 with a small business size standard of 1000 employees. (v) Line items are detailed as follows: LINE ITEM: 0001 DESCRIPTION: Compressor with hose EXTENDED DESCRIPTION: The two permanent HPACs (High Pressure Air Compressor) onboard BATAAN produce a final pressure of 3000 PSI(pounds per square inch), each compressor requires a rated discharge capacity of 22 cubic feet per hour (CFH). The compressor (QTY 1) must have a combination of 2700-3300psi as a final discharge, a control system to start at appx. 2700 and shut off at appx. 3300, 19.8 SCFM (Standard Cubic Feet Per Minute), and must be air cooled. Hose (QTY1) for compressor must be at least 75FT, thread into the outlet of the HPAC, and through adapter or other be able to connect to the ship�s force HP air inlet which is a 1 inch male threaded valve. Any additional adapter or other connector must be included in quote. Pricing to include shipping, method of Payment is GPC QTY: 1 UNIT OF ISSUE: EA (vi) This requirement is for a compressor in support of USS BATAAN. (vii) The required delivery date (RDD) is: 24 weeks ARO. The PLACE OF PERFORMANCE is: ATTN: USS BATAAN LHDS, 1968 Morris St. Bldg Y-109 Dwy 11, Norfolk, VA 23511. FOB Destination will be used. All clauses and provisions applicable to this requirement are included in the attached ""Clauses and Provisions"", Attachment 1. �Clauses and Provisions to be signed�, Attachment 2, shall be signed and returned with the vendor�s quote unless referenced clauses and provisions are certified in SAM. The Defense Priorities and Allocations System (DPAS) rating does not apply to this acquisition. All quotes are due by the date and time specified in this posting and shall be submitted via email to the POC email address stated in this posting. The individual to contact for information regarding this solicitation is stated in the posting. ATTACHMENTS: Clauses and Provisions Clauses and Provisions to be signed Salient Characteristics
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1de4030534b045a78fc23e47e34b74fc/view)
 
Place of Performance
Address: Norfolk, VA 23511, USA
Zip Code: 23511
Country: USA
 
Record
SN07415715-F 20250423/250421230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.