SOLICITATION NOTICE
Y -- NM BR AAO EL VADO HERON & EL VADO ROAD REHAB
- Notice Date
- 4/18/2025 9:22:12 AM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
- ZIP Code
- 80228
- Solicitation Number
- 6982AF25B000003
- Response Due
- 5/3/2025 1:00:00 PM
- Archive Date
- 05/18/2025
- Point of Contact
- Denise Martinez
- E-Mail Address
-
CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- NM BR AAO EL VADO Heron & El Vado Road Rehabilitation Competed as Total Small Business Set Aside THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park. This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots: � Heron State Park Visitors Center Parking Lot, Heron Lake State Park � Willow Creek Boat Ramp Parking Lot, Heron Lake State Park � Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park. Additionally, an existing gravel parking located within El Vado State Park will be paved. Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project. PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include: 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth 13,000 ton of Asphalt Concrete Pavement 75 ton of Prime Coat, Method 1 55 ton of Fog Seal 33 miles of Pavement Markings, Type B, Solid 500 cubic yards of Roadway Excavation 2,100 ton of Roadway Aggregate, Method 2 60 square yards of Sidewalk, Concrete 15 Cleaning Culvert in Place It is anticipated this project will be advertised in May 2025 and be under construction Summer 2025 with project completion date in Fall of 2025. The estimated price range of the project work is between $5,000,000 and $10,000,000.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4678424d834f48d9bcd8dd68103d2412/view)
- Place of Performance
- Address: Tierra Amarilla, NM, USA
- Country: USA
- Country: USA
- Record
- SN07414183-F 20250420/250418230044 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |