Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 12, 2025 SAM #8538
SOLICITATION NOTICE

Z -- Saginaw CDF Incremental Dike Raising Phase II

Notice Date
4/10/2025 2:17:52 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W072 ENDIST DETROIT DETROIT MI 48226-5000 USA
 
ZIP Code
48226-5000
 
Solicitation Number
W911XK25BA004
 
Response Due
4/10/2025 11:00:00 AM
 
Archive Date
03/18/2026
 
Point of Contact
Noah Bruck, Phone: 3132262657, Michelle Barr, Phone: 3132262767
 
E-Mail Address
noah.r.bruck@usace.army.mil, michelle.barr@usace.army.mil
(noah.r.bruck@usace.army.mil, michelle.barr@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
Posting the Bid Abstract ***Amendment 0002 is issued to extend the bid due date from March 27, 2025 to April 10, 2025 and to provide government responses to questions received. FAR clauses 52.204-8 and 52.223-23 have been deleted and replaced with 52.204-8 (Deviation 2025-O0004) and 52.223-23 (Deviation 2025-O0004). All other terms and conditions remain unchanged.*** ***Amendment 0001 is issued to remove FAR Clauses in accordance with Class Deviation 2025-O0003 Restoring Merit Based Opportunity In Federal Contracts, Issued March 4, 2025. Full details can be found in the amendment document. All other terms and conditions remain unchanged.*** This project includes the construction of Phase II of the incremental raising of the south perimeter dike at the Saginaw CDF. Mobilize to the site through the northeast platform of the CDF. Clear and grub the brush and vegetation from the dike construction limits and all material borrow areas. Material from the CDF will be used to raise the dike, excluding NE cell. Grade and compact the raised south dike to EL +18 LWD with 3H:1V slopes including subgrade preparation and compaction prior of fill placement; raising area around weir to +12.5 LWD including elevating the weir to at least +15 LWD. Plant grass on the exterior slope of the raised dike for erosion control. Demobilize when complete.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2410a52cfb7c4c7388511939c9ddf9b6/view)
 
Record
SN07404372-F 20250412/250410230102 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.