SOLICITATION NOTICE
Y -- Northport Mill and Fill Project. No. 632-25-001
- Notice Date
- 3/20/2025 2:01:55 PM
- Notice Type
- Solicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
- ZIP Code
- 12208
- Solicitation Number
- 36C24225B0009
- Response Due
- 3/27/2025 7:00:00 AM
- Archive Date
- 04/26/2025
- Point of Contact
- Torell D Camp, Contract Specialist
- E-Mail Address
-
Torell.Camp@va.gov
(Torell.Camp@va.gov)
- Awardee
- null
- Description
- Additional RFI Responses 1. Please provide a detail for the concrete ADA ramps construction; ADA concrete ramp details provided. 2. Please provide a detail for the new curbs; New 6 curb detail provided. 3. Please provide how much will be milled (2"", all the way to the dirt, etc.); 3 to be milled to the base layer for new top course and binder course. 4. What is the thickness for the new paving?; and Areas of new paving shall be 1 ½ top course, 1 ½ binder course, and a 3 base course over a 6 crushed stone base. See specifications. 5. What is the thickness of the new concrete? Please provide a detail for the new concrete sidewalks. New sidewalks to be 4 , see detail provided. 6. What is the specific depth & material for the 3 Paving shall be a 1 ½ asphalt top course and a 1 ½ binder course installed to match existing elevations. See specifications. 7. What materials do you want to be placed for each layer for the 3 ? Paving shall be a 1 ½ asphalt top course and a 1 ½ binder course.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d23b843cc3754b85b7669e7ce278e451/view)
- Record
- SN07379295-F 20250322/250320230048 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |