Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 20, 2025 SAM #8515
SOLICITATION NOTICE

73 -- Bern CMR Kitchen Refurbishment

Notice Date
3/18/2025 7:27:44 AM
 
Notice Type
Presolicitation
 
NAICS
337126 —
 
Contracting Office
U.S. EMBASSY BERN WASHINGTON DC 20520 USA
 
ZIP Code
20520
 
Solicitation Number
19SZ2325Q0007
 
Response Due
4/3/2025 8:00:00 AM
 
Archive Date
04/18/2025
 
Point of Contact
Yale Layton, Paul Aeschlimann
 
E-Mail Address
bernGSOContracting@state.gov, berngsocontracting@state.gov
(bernGSOContracting@state.gov, berngsocontracting@state.gov)
 
Description
The U.S. Embassy Bern is seeking a qualified contractor to upgrade the kitchen cooking, refrigeration, and food preparation systems at the Chief of Mission Residence (CMR). This project requires the contractor to fabricate the majority of the systems off-site. All new equipment must improve durability, sanitation, and overall functionality within the kitchen space, meet or exceed Swiss codes, and have certified factory service technicians located within 150 km of the CMR. The kitchen shall only be offline for no more than 8 consecutive calendar days at one time. Scope of Work (Synopsis) The contractor shall perform the following tasks, which can be done separately or together: Removal of Existing Systems: Disconnect and safely remove all existing cooking systems, and properly dispose of or recycle the removed materials in compliance with local regulations. Installation of New Systems: Supply, deliver, and install all new systems in accordance with manufacturer�s instructions, applicable Swiss codes, and best practices. This includes installing stainless steel bases/footings, testing and validating components, ensuring secure and level installation, and including necessary hardware. All seams, edges, and joints must be welded and polished to a smooth finish. Additional features such as pull-out shelves, drawer units, or customized units should be installed as required. Finishing and Clean-Up: Clean all surfaces after installation, perform a final inspection to ensure proper installation, dispose of construction debris and packaging material in an eco-friendly manner, and ensure the kitchen is ready for immediate use upon completion of each system.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d01489752291411a8147d47f5b2960cc/view)
 
Place of Performance
Address: CHE
Country: CHE
 
Record
SN07376549-F 20250320/250318230053 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.