Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 15, 2025 SAM #8510
SOURCES SOUGHT

99 -- F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20

Notice Date
3/13/2025 8:49:05 AM
 
Notice Type
Sources Sought
 
Contracting Office
F3YCCF 448 SCMW TINKER AFB OK 73145-0000 USA
 
ZIP Code
73145-0000
 
Solicitation Number
F16_Aircraft_Noun_Trailing_Edge_NSN_1560_01_725_3383_PN_202312284-20
 
Response Due
11/30/2026 9:00:00 PM
 
Archive Date
12/16/2026
 
Point of Contact
Tracey Beringer, Phone: 777-2211
 
E-Mail Address
tracey.beringer@us.af.mil
(tracey.beringer@us.af.mil)
 
Description
1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part. Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured. 2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $4000. c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Trailing Edge, Aircraft and other factors.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/74a6c998d2c341a28fe202c710db95ff/view)
 
Place of Performance
Address: Tinker AFB, OK 73145, USA
Zip Code: 73145
Country: USA
 
Record
SN07372358-F 20250315/250314000115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.