SOLICITATION NOTICE
17 -- 17--FITTING,HOLD BACK,A
- Notice Date
- 3/13/2025 4:00:48 AM
- Notice Type
- Solicitation
- NAICS
- 336413
— Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT PHILADELPHIA PA 19111-5098 USA
- ZIP Code
- 19111-5098
- Solicitation Number
- N0038325RC335
- Response Due
- 4/14/2025 11:00:00 AM
- Archive Date
- 04/29/2025
- Point of Contact
- Telephone: 2156971143
- E-Mail Address
-
ALEXIS.HEALY@NAVY.MIL
(ALEXIS.HEALY@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N792.08|T2N|2159671143|Alexis.healy@navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (combo) Type||Cognizant DFAS|N00383|Cognizant DCMA|Cognizant DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|336413|1250||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This solicitation is for made new manufacture spare parts. This is a sole source requirement. The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source. These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at https://public.navsup.navy.mil/public/ops$public.business_vendor_form_new Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation. For information or questions regarding this notice, please contact Alexis Healy at the email address: alexis.k.healy.civ@us.navy.mil. NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission. All contractual documents related to the instant procurement are considered to be ""issued"" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to ""issue"" contractual documents as detailed herein. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.3 The components being acquired under this solicitation have been classified as Flight Critical requiring engineering source approval by the Naval Air Systems Command. Only those companies who have submitted requests for source approval and been approved will be eligible for award under this solicitation. Any company not previously approved may submit a Source Approval Request to the contracting officer, Naval Inventory Control Point, (See Block 10 of the SF33 for name and code). The Source Approval Request shall contain the following documentation and shall be submitted by the closing date of this solicitation: (A) Copy of complete configuration drawings for a similar item(s) which your company has produced within the past three years, including test procedures for which your company (1) has been qualified to manufacture and (2) which is similar, i.e., requires the same materials, manufacturing processes, inspections, tolerances and similar application as the item(s) for which you are seeking approval. (B) Copy of the complete process/operation sheets used to manufacuture the similar item, including but not limited to, detailed shop sketches. These plans must note those operations and processes performed by subcontractors/ vendors. (C) Complete copies of purchase orders, shipping documents, etc. that document delivery of production quantities of the part to the Original Equipment Manufacturer or Military service. Provide the most recent copies of the documents. (D) A detailed comparative analysis of the differences/similarities between the similar part and the part(s) for which you are seeking approval. This analysis should include materials, configuration, tolerances, process requirements, dimensions, castings, forgings, etc. (E) Copy of inspection method sheets used in the manufacturing and at final inspection. These sheets should include actual tolerance, print requirements, inspection devices, sources performing the operation and level of inspection. Critical characteristics should be discernible from all other characteristics. The above requirements are a subset of requirements specified in the ASO Source Approval Information Brochure dated January 1995. The submission of this data subset is contingent upon and in consideration of the submitting contractor meeting all other requirements specified in this solicitation to include a bilateral agreement with MDA which includes availability of complete data, MRB disposition, etc. Any company not having such agreement, but desiring to seek engineering source approval, will be required to submit data meeting all requirements of the ASO/NAVICP Source Approval Brochure. 1.4 Sampling rates (AQLs) indicated below shall be used in accordance with ANSI Z1.4 for Single Sampling and a General Inspection Level of II. 1.5 In addition to the 100% PCO Mandatory, critical and major characteristics, attributes for plating, hardness and non-destructive testing will be inspected one hundred percent. 1.6 Contractor shall develop a system for identification of individual piece parts for traceability purposes. Markings shall not be permanent. 1.7 An AQL of 1.5 will be used for Class 3 threads and dimensions, and geometric feature controls with a tolerance range of .010 or less. 1.8 For minor characteristics, a sampling rate determined by the contractor and subject to QAR approval will be used. 1.9 The material covered in this contract/purchase order will be used in a crucial shipboard system enabling the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems or loss of aircraft. Therefore,the material has been designated as Critical material and special control procedures are invoked to ensure receipt of correct material. 1.10 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;NAWC LAKEHURST; drawing number ( ;30003; ) ;2-7938-5; , Revision ;H; and all details and specifications referenced therein. 1.11 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.12 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS DRAWING DATA=MPR 520 |80020| -| |D| | | | DRAWING DATA=PL-2-7938 |97415| T| |D| | | | DRAWING DATA=2-7938 |97415| H| |D| | | | DRAWING DATA=7-0508-3 |97415| C| |D| | | | DRAWING DATA=7-0517-2 |97415| L| |D| | | | DRAWING DATA=7-0518-2 |97415| F| |D| | | | DRAWING DATA=7-0522-2 |97415| M| |D| | | | DRAWING DATA=7-0529-3 |97415| H| |D| | | | DRAWING DATA=7-0533-3 |97415| M| |D| | | | DRAWING DATA=7-0545-2 |97415| G| |D| | | | DRAWING DATA=7-0620-3 |97415| G| |D| | | | DRAWING DATA=7-0621-1 |97415| H| |D| | | | DRAWING DATA=7-0622-2 |97415| E| |D| | | | DRAWING DATA=7-0623-2 |97415| F| |D| | | | DRAWING DATA=7-1668-3 |97415| H| |D| | | | 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE Unique Requirements: 1. All records pertaining to ALRE CSI/CAI manufacture and inspection/test shall be provided to the ALRE Cognizant Technical Authority. All records shall be maintained by LKE QA and by the manufacturer for a period of seven years. 2. Interim Inspection Requirements: N/A 3. ALRE CSI parts require certification. a. When certified, an ALRE part is marked with a Material Identification Code (MIC). NAWCADLKE QA will provide the MIC to DCMA if the component is source accepted, and after receipt of all associated data. Application of MIC shall bein the same methodology as the drawing note for part marking, and in same area as part marking (next to, above, or below). 4. Receipt inspection and Certification of Sub-Components: a. The following parts shall be certified at Lakehurst. As explained in the ""Data to Substantiate Receipt Inspection and Certification of Subcomponents"" CDRL below, any data requested for a specific part that is cited in that CDRL shall be included with the part that is shipped to Lakehurst. Upon completion of certification, each part will be shipped back to the contractor for final assembly, for performance of the inspections detailed in section N.5 below, and for final acceptance. i. P/N 7-1668-3. ii. P/N 7-0508-3. iii. P/N 7-0517-2. iv. P/N 7-0518-2. v. P/N 7-0522-2. vi. P/N 7-0529-3. vii. P/N 7-0533-3. viii. P/N 7-0545-2. ix. P/N 7-0621-1. x. P/N 7-0622-2. xi. P/N 7-0623-2. 5. Receipt Inspection and Certification of the Top Assembly: The receipt Inspection and Certification of the Top Assembly, P/N 2-7938-5, shall occur during the final inspection. The following inspections shall be performed at that time with DCMA oversite: a. P/N 2-7938-5; Repeatable Release Holdback Bar, F/A-18 E/F (CSI): i. Witness of final settings per ATP 4-7938. Note 11 of Parts List PL-2-7938 refers. ii. Witness of proof pressure test per ATP 4-7936. iii. Witness of release tests cited in para 6.4 of ATP 4-7938. iv. Verification of assembly and torque per Note 15 of Parts List PL-2-7938. v. Witness of dimensional alignment settings per Notes 17, 18, and 19 of Parts List PL-2-7938. 6. Contractor Assist and Part Marking: a. The contractor shall assist on the conduct of the inspections (both final and interim) required that are necessary to certify the critical items specified herein. The contractor shall provide adequate facilities, inspection equipment, and skilled personnel, to support the NAWCADLKE Inspector in the conduct of the interim inspection(s). The contractor shall provide gauges, tools, fixtures, and jigs necessary to perform the inspections. The contractor shall also provide sufficient rigging/material handling services and manpower to setup/configure/operate equipment & machines used to accomplish the inspection task. This contractor assist requirement shall be applicable to 100% of the production quantities. As part of the MRI process, the NAWCADLKE QA representative will provide, in writing, a certification number along with direction for marking the Critical Safety Items (CSI). 7. Delivery Schedule: a. P/N 7-1668-3. This part shall be delivered at a maximum rate of 5 units per month. b. P/N 7-0508-3. This part shall be delivered at a maximum rate of 10 units per month. c. P/N 7-0517-2. This part shall be delivered at a maximum rate of 10 units per month. d. P/N 7-0518-2. This part shall be delivered at a maximum rate of 10 units per month. e. P/N 7-0522-2. This part shall be delivered at a maximum rate of 10 units per month. f. P/N 7-0529-3. This part shall be delivered at a maximum rate of 5 units per month. g. P/N 7-0533-3. This part shall be delivered at a maximum rate of 10 units per month. h. P/N 7-0545-2. This part shall be delivered at a maximum rate of 10 units per month. i. P/N 7-0621-1. This part shall be delivered at a maximum rate of 10 units per month. j. P/N 7-0622-2. This part shall be delivered at a maximum rate of 30 units per month. k. P/N 7-0623-2. This part shall be delivered at a maximum rate of 30 units per month. 8. Turn Around Time: a. For purposes of planning, the estimated time for the items listed in section N.7 is 30 days after the date of receipt. QUALITY ASSURANCE REQUIREMENTS 1. The solicitation/contract shall contain the NAWCADLKE inspection surveillance clause as follows: a. N/A b. N/A 2. The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a. Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b. Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c. Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as defined by ANSI Z1.4. 3. The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material. 4. First Article Testing: N/A 5. Production Lot Special Tests: N/A 6. For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 7. Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the organizations listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc. (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc. (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4.1 Review documentation as provided under DD 1423 requirements. 4.2 CRITICAL MANUFACTURING PROCESSES ( ;APPLIES; ) HEAT TREAT ( ; ; ) WELDING ( ;APPLIES; ) CADMIUM PLATING ( ;APPLIES; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ;APPLIES; ) CASTING(S) ( ; ; ) FORGING(S) ( ;APPLIES; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.3 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;Roy Janney NAWCADLKE QA / Tel: (732)-323-2834 E-mail: roy.a.janney.civ@us.navy.mil; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.4 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ;APPLIES; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.5 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ;Roy Janney NAWCADLKE QA / Tel: (732)-323-2834 E-mail: roy.a.janney.civ@us.navy.mil; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS A ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP REFERENCE ONLY: (24-10057): THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS ""CRITICAL"" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND ONLY THOSE COMPANIES WHO HAVE SUBMITTED & BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION ANY COMPANY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 3) SUBTITLE: DATA TO SUBSTANTIATE RECEIPT INSPECTION AND CERTIFICATION OF SUB-COMPONENTS. (BLOCK 12) DATE OF FIRST SUBMISSION: CONCURRENTLY WITH PART DELIVERY TO NAVAIR LAKEHURST FOR RECEIPT AND CERTIFICATION OF SUB-COMPONENTS. Data Requirements: a. Copies of all approved Request for Deviations, Request for Wavers and all approved MRB actions. b. Chrome plate per Drawings 7-1668, 7-0508, 7-0522, 7-0529, and7-0621. c. Cadmium plate per Drawings 7-1668, 7-0508, 7-0522, 7-0529, and7-0545. d. Shot peen per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0545, and 7-0621. e. Hardness test per Drawings 7-0517, 7-0622, and 7-0623. f. Stress relief per Drawings 7-1668, 7-0508, 7-0518, 7-0545, 7-0517, and 7-0621. g. Magnetic particle inspection per Drawings 7-1668, 7-0508, 7-0517, 7-0518, 7-0522, 7-0529, 7-0533, 7-0545, 7-0621, 7-0622, and 7-0623. h. Heat treat per Drawings 7-1668, 7-0508, 7-0518, 7-0522, 7-0529, 7-0545, and 7-0621. i. Dimensional inspection per Drawings 7-1668, 7-0508, 7-0517, 7-0518, 7-0522, 7-0529, 7-0533, 7-0545, 7-0621, 7-0622, and 7-0623. j. Material certification per Drawings 7-1668, 7-0508, 7-0517, 7-0518, 7-0522, 7-0529, 7-0533, 7-0545, 7-0621, 7-0622, and 7-0623. k. Carburize IAW MPR 520 per Drawings 7-0517, 7-0533, 7-0622, and 7-0623. l. Glass bead peen per Drawing 7-0529. m. Temper etch inspection per Drawings 7-1668, 7-0508, and 7-0545. n. Dry film lubricant per Drawing 7-1668. o. Passivation per Drawing 7-0517 and 7-0533. p. All certifications, copies of any CMM printouts, test reports, and in-process inspection documentsneeded to substantiate product quality for P/Ns: P/N 7-1668-3, P/N 7-0508-3, P/N 7-0517-2, P/N7-0518-2, P/N 7-0522-2, P/N 7-0529-3, P/N 7-0533-3, P/N 7-0545-2, P/N 7-0621-1, P/N 7-0622-2,and P/N 7-0623-2. q. Results of Heat treat samples IAW MPR 520 for P/Ns 7-0517-2, 7-0533-3, 7-0622-2, and 7-0623-2. DATE OF FIRST SUBMISSION=ASREQ 16. REMARKS: (BLOCK 3) SUBTITLE: DATA TO SUBSTANTIATE RECEIPT INSPECTION AND CERTIFICATION OF TOP ASSEMBLY (BLOCK 12) DATE OF FIRST SUBMISSION: CONCURRENTLY WITH FINAL INSPECTION. Data Requirements: a. Copies of all approved Request for Deviations, Request for Wavers and all approved MRB actions. b. Functional test IAW ATP 4-7938. c. Final settings IAW ATP 4-7938. d. Torque settings per Parts List (PL) 2-7938 and Drawing 7-0530. e. Dimensional/alignment settings per PL 2-7938. f. Chrome plate per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0620, and 7-0621. g. Cadmium plate per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0545, and 7-0546. h. Shot peen per Drawings 7-1668, 7-0508, 7-0522, 7-0529, 7-0545, and 7-0621. i. Hardness test per Drawings 7-0622, and 7-0623. j. Stress relief per Drawings 7-1668, 7-0508, 7-0518, 7-0538, 7-0545, and 7-0621. k. Magnetic particle inspection per Drawings 7-0508, 7-0514, 7-0518, 7-0522, 7-0528, 7-0529, 7-0530, 7-0533, 7-0538, 7-0539, 7-0545, 7-0620, 7-0621, 7-0622, 7-0623, and 7-2334. l. Heat treat per Drawings 7-1668, 7-0508, 7-0514, 7-0518, 7-0522, 7-0523, 7-0528, 7-0529, 7-0530, 7-0538, 7-0539, 7-0540, 7-0541, 7-0545, 7-0546, 7-0547, 7-0620, 7-0621, and 7-2334. m. Dimensional inspection per Drawings 7-1668, 7-0508, 7-0509, 7-0511, 7-0514, 7-0517, 7-0518, 7-0519, 7-0520, 7-0521, 7-0522, 7-0523, 7-0524, 7-0525, 7-0526, 7-0527, 7-0528, 7-0529, 7-0530, 7-0533, 7-0535, 7-0538, 7-0539, 7-0540, 7-0541, 7-0542, 7-0543, 7-0544, 7-0545, 7-0546, 7-0547, 7-0548, 7-0581, 7-0620, 7-0621, 7-0622, 7-0623, 7-0629, 6-0140, 6-0141, 6-0251, 6-0252, 7-2334, and 7-2723. n. Material certification per Drawings 7-1668, 7-0508, 7-0509, 7-0511, 7-0514, 7-0517, 7-0518, 7-0519, 7-0520, 7-0521, 7-0522, 7-0523, 7-0524, 7-0525, 7-0526, 7-0527, 7-0528, 7-0529, 7-0530, 7-0533, 7-0535, 7-0538, 7-0539, 7-0540, 7-0541, 7-0542, 7-0543, 7-0544, 7-0545, 7-0546, 7-0547, 7-0548, 7-0581, 7-0620, 7-0621, 7-0622, 7-0623, 7-0629, 6-0140, 6-0141, 6-0251, 6-0252, 7-2334, and 7-2723. o. Passivate per Drawings 7-0511, 7-0519, 7-0520, 7-0521, 7-0523, 7-0524, 7-0525, 7-0527,7-0528, 7-0530, 7-0535, 7-0539, 7-0540, 7-0541, 7-0543, 7-0546, 7-0548, and 7-2334. p. Penetrant inspection per Drawings 7-0523, 7-0526, 7-0540, 7-0541, 7-0542, 7-0546, and 7-0581. q. Anodize per Drawings 7-0629, and 7-2723. r. Sand Blast per Drawing 7-0540. s. Glass bead blast per Drawing 7-0546. t. Glass bead peen per Drawing 7-0529. u. Paint per PL 2-7938; and Drawings 7-1668, 7-0508, 7-0529, 7-0530, 7-0539, 7-0629, 7-2334, and 7-2723. v. Temper etch inspection per Drawings 7-1668, 7-0508, and 7-0545. w. Dry film lubricant per Drawing 7-1668. x. Lubricant per Drawing 2-7938. y. Sealant per Drawing 2-7938. z. Carburize IAW MPR 520 per Drawings 7-0517, 7-0533, 7-0622, and 7-0623. aa. Urethane casting per Drawing 7-0539. DATE OF FIRST SUBMISSION=030 DAC 16. REMARKS: Manufacturing Plan only need to be submitted if different than Manufacturing Plans listed below: 1. Load Release Sleeve (P/N 7-0518-2), Triumph Plan dated 24 SEP 2019 (via C-ECR 20E0051). 2. Collet Head (P/N 7-1668-3), Triumph Plan dated 30 AUG 2023 (via C-ECR 23E0309). 3. Collet Collar (P/N 7-0508-3), Triumph Plan dated 16 JAN 2015 (via C-ECR 15E0095). 4. Lock Ring Seat (P/N 7-0517-2), Triumph Plan dated 20 JAN 2021 (via C-ECR 21E0017). 5.Cylinder (P/N 7-0522-2), Triumph Plan dated 04 FEB 2015 (via C-ECR 15E0058). 6. Strain Bar (P/N 7-0529-3), Triumph Plan dated 07 OCT 2022 (via C-ECR 22E0377). 7. Load Transfer Sleeve (P/N 7-0533-3), Triumph Plan dated 13 OCT 2016 (via C-ECR 16E0249). 8. Rod End Connector (P/N 7-0545-2), Triumph Plan dated 31 AUG 2022 (via C-ECR 22E0254). 9. Thrust Bearing (P/N 7-0621-1), Triumph Plan dated 27 OCT 2023 (via C-ECR 23E0340). 10. Primary Lock Segment (P/N 7-0622-2), Triumph Plan dated 15 AUG 2023 (via C-ECR 23E0350). 11. Secondary Lock Segment (P/N 7-0623-2), Triumph Plan dated 26 AUG 2023 (via C-ECR 23E0335). NOTE: Revisions to any of the eleven manufacturing processes listed above must be approved by NAWCADLKE code BL14300 through an Engineering Change Request. Tailor DI-MISC-80074 as follows: a. Delete 10.2.1.3 b. Delete 10.2.2.3.1 c. Delete 10.2.3.2 d. Delete 10.2.3.6 e. Delete 10.2.3.7.2 f. Delete 10.2.3.7.3 g. Delete 10.2.3.7.4 h. Delete 10.2.3.7.5 i. Delete 10.2.6 The manufacturing plan shall as a minimum include the following: a. Documentation of all required manufacturing processes. b. All required equipment c. All manufacturing process sheets. d. Identify all subcontractor manufacturing processes and associated subcontractor. e. Provide any necessary personnel certification. f. Plan shall be submitted for P/Ns 7-0518-2, 7-1668-3, 7-0508-3, 7-0517-2, 7-0522-2, 7-0529-3, 7-0533-3, 7-0545-2, 7-0621-1, 7-0622-2, and 7-0623-2. DATE OF FIRST SUBMISSION=030 DAC 16. REMARKS Material Review Board Procedure (MRB) that describes a process forthe review of minor non-conformances per MIL-STD-1520C except that the provisions for Government participation and approval as specified in section 4.7 shall be executed concurrently with the Contractor's review and disposition process stated in para 4.5.1. Government participation shall include NAVAIR In-Service Engineering Code BL14300 and the DCMA Quality Assurance Representative. NAVAIR participation shall be in the concurrent review and subsequent approval/disapproval of submitted minor non-conformances whereby, as part of their MRB process, the contractor will submit their requests to NAWCADLKE via email to the following email address: LKHR_ENGRG_REQUESTS@NAVY.MIL
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4642d68594834df8b6cdb183186203f5/view)
- Record
- SN07371110-F 20250315/250314000106 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |