SPECIAL NOTICE
20 -- JAMES REPAIR FEEDBACK CIRCIUT
- Notice Date
- 3/6/2025 11:03:01 AM
- Notice Type
- Special Notice
- NAICS
- 336611
— Ship Building and Repairing
- Contracting Office
- SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
- ZIP Code
- 94501
- Solicitation Number
- 70Z085Q250011656
- Response Due
- 3/7/2025 12:00:00 PM
- Archive Date
- 03/07/2025
- Point of Contact
- GEORGE, JERAMYAH, Phone: 5104375436, DONNA O'NEAL, Phone: 5103931145
- E-Mail Address
-
JERAMYAH.W.GEORGE@USCG.MIL, Donna.J.O'Neal@uscg.mil
(JERAMYAH.W.GEORGE@USCG.MIL, Donna.J.O'Neal@uscg.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- THIS IS TO BE AWARDED SOLE SOURCE. TECHNICAL SERVICES TO REPAIR FEEDBACK CIRCIUT IN CONTROLLABLE PITCH PROPELLER (CPP) SYSTEM Background. Cutter is experiencing astern creep at HP 0 in Dual Engine Maneuvering Mode. MCS-5 reports pitch percentages of 1% to 1% when at HP 0, but astern creep is significant enough to require one shaft ahead at HP 2 to maintain longitudinal position alongside pier. Astern creep tendency observed on both shafts via prop wash. Cutter has new potentiometer in the feedback circuit to remedy but needs the new values adjusted in the CanMan system. Without these adjustments the cutter maneuvering system is severely degraded. They are also experiencing several loss of engine speed control incidents while in Starboard Cruise mode, resulting in severe engine bogging or uncommanded declutches and engine shutdowns. Issue appears to occur when the operator increases handle position from ~2 to ~5, at which point pitch on both shafts increases as expected but engine RPM/power output does not, causing the engine to bog down to ~240 ERPM at which point the system automatically declutches both shafts and shuts the engine down. Scope. Kongsberg has qualified Tech Rep and has all proprietary data for the key required to adjust the settings in the CanMan system. This is the program the interfaces with Rolls Royce MCMS programming. INSTALL NEW POTENIOMETER IN THE FEEDBACK CIRCIUT. ALL PARTS ARE ONBOARD THE CUTTER ADJUST NEW NUMERIC VALUES IN THE MCMS/ CANMAN PROGRAMMING. Troubleshoot mapping and adjustments of throttle position compared to CPP system. Tasks. The contractor shall provide technical expertise for renewal or repair of the equipment to normal operation. Delivery. Contractor shall provide a final report within 3 days of contract period of performance. Place of performance- CGC JAMES Naval Station Norfolk 1530 Gilbert Street Suite 2000 Norfolk, VA 23511 Period of performance- 08 MAR 2025 � 14 MAR 25 Tech can schedule 2 days anytime during POP. Points of Contact. 10.1. USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, 510-460-8195
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/734cff60d5f64c8984eec99f5d76a6ef/view)
- Place of Performance
- Address: Norfolk, VA 23511, USA
- Zip Code: 23511
- Country: USA
- Zip Code: 23511
- Record
- SN07362944-F 20250308/250307152907 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |