Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 08, 2025 SAM #8503
SPECIAL NOTICE

20 -- JAMES REPAIR FEEDBACK CIRCIUT

Notice Date
3/6/2025 11:03:01 AM
 
Notice Type
Special Notice
 
NAICS
336611 — Ship Building and Repairing
 
Contracting Office
SFLC PROCUREMENT BRANCH 2(00085) ALAMEDA CA 94501 USA
 
ZIP Code
94501
 
Solicitation Number
70Z085Q250011656
 
Response Due
3/7/2025 12:00:00 PM
 
Archive Date
03/07/2025
 
Point of Contact
GEORGE, JERAMYAH, Phone: 5104375436, DONNA O'NEAL, Phone: 5103931145
 
E-Mail Address
JERAMYAH.W.GEORGE@USCG.MIL, Donna.J.O'Neal@uscg.mil
(JERAMYAH.W.GEORGE@USCG.MIL, Donna.J.O'Neal@uscg.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS TO BE AWARDED SOLE SOURCE. TECHNICAL SERVICES TO REPAIR FEEDBACK CIRCIUT IN CONTROLLABLE PITCH PROPELLER (CPP) SYSTEM Background. Cutter is experiencing astern creep at HP 0 in Dual Engine Maneuvering Mode. MCS-5 reports pitch percentages of 1% to 1% when at HP 0, but astern creep is significant enough to require one shaft ahead at HP 2 to maintain longitudinal position alongside pier. Astern creep tendency observed on both shafts via prop wash. Cutter has new potentiometer in the feedback circuit to remedy but needs the new values adjusted in the CanMan system. Without these adjustments the cutter maneuvering system is severely degraded. They are also experiencing several loss of engine speed control incidents while in Starboard Cruise mode, resulting in severe engine bogging or uncommanded declutches and engine shutdowns. Issue appears to occur when the operator increases handle position from ~2 to ~5, at which point pitch on both shafts increases as expected but engine RPM/power output does not, causing the engine to bog down to ~240 ERPM at which point the system automatically declutches both shafts and shuts the engine down. Scope. Kongsberg has qualified Tech Rep and has all proprietary data for the key required to adjust the settings in the CanMan system. This is the program the interfaces with Rolls Royce MCMS programming. INSTALL NEW POTENIOMETER IN THE FEEDBACK CIRCIUT. ALL PARTS ARE ONBOARD THE CUTTER ADJUST NEW NUMERIC VALUES IN THE MCMS/ CANMAN PROGRAMMING. Troubleshoot mapping and adjustments of throttle position compared to CPP system. Tasks. The contractor shall provide technical expertise for renewal or repair of the equipment to normal operation. Delivery. Contractor shall provide a final report within 3 days of contract period of performance. Place of performance- CGC JAMES Naval Station Norfolk 1530 Gilbert Street Suite 2000 Norfolk, VA 23511 Period of performance- 08 MAR 2025 � 14 MAR 25 Tech can schedule 2 days anytime during POP. Points of Contact. 10.1. USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, 510-460-8195
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/734cff60d5f64c8984eec99f5d76a6ef/view)
 
Place of Performance
Address: Norfolk, VA 23511, USA
Zip Code: 23511
Country: USA
 
Record
SN07362944-F 20250308/250307152907 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.