Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 07, 2025 SAM #8501
SOLICITATION NOTICE

Y -- FY25 Airfield Striping & Rubber Removal | Dover AFB, DE

Notice Date
3/5/2025 12:25:09 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
FA4497 436 CONS LGC DOVER AFB DE 19902-5016 USA
 
ZIP Code
19902-5016
 
Solicitation Number
FA449725R0007
 
Response Due
3/21/2025 9:00:00 AM
 
Archive Date
04/05/2025
 
Point of Contact
SSgt Mariah Thompson, Phone: 3026775104, Ms. Omelia Saunders, Phone: 3026775545
 
E-Mail Address
mariah.thompson@us.af.mil, omelia.saunders.2@us.af.mil
(mariah.thompson@us.af.mil, omelia.saunders.2@us.af.mil)
 
Description
AMENDMENT 001 Please review all attchements for updated information and new RFP Due date. The 436 Contracting Squadron is conducting this solicitation to identify contractors who possess the capability to fulfill the requirement specified below: Description of Service: The project consists of providing all labor, materials and equipment necessary to remove paint and rubber and to stripe Dover AFB Airfield as well as other heavy-duty pavement striping applications. Specifications include the following: 1. Repaint existing and paint new pavement markings in accordance with the Statement of Work (SOW) and the applicable drawings. A maximum of 290,000 SF of striping (225,000 SF-Reflective, 65,000 SF-non-reflective) shall be accomplished by the Contractor based on a priority list to be provided by the Contracting Officer just prior the Contractor performing the work. The Contractor shall remove built up and flaking markings as required up to a maximum of 12,000 SF. The contractor may propose to use either Type I or Type III beads in the reflective markings. 2. Rubber removal portion consists of furnishing all labor, equipment, tools, appliances, and materials required to remove 85% of the rubber build up from 100% of the rubber covered within a designated area of runway (area approximately 2500 LF x 65 LF x 3 Runway ends) . The rubber removal is to be completed without damage to the pavement surface, joints, and joint and crack seals, or any other government property. Site Visit Information: A site visit is not necessary to refine this requirement. Proposals: Contractors are encouraged to offer their most advantageous/best proposal. The contractor shall submit their proposal by 21 March 2025, no later than 12:00 PM EST to the contracting office by e-mail to all points of contact listed below in order to be considered. Proposals must be valid through for 120 calendar days. Government POCs: SSgt Mariah Thompson (302) 677-5104 mariah.thompson@us.af.mil Omelia Saunders (302) 677-5042 omelia.saunders.2@us.af.mil
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1bf364c3b42d4a70aa810f6c64e49c92/view)
 
Place of Performance
Address: Dover AFB, DE 19902, USA
Zip Code: 19902
Country: USA
 
Record
SN07361709-F 20250307/250307070529 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.