Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MARCH 07, 2025 SAM #8501
SOLICITATION NOTICE

Y -- FY25 Willapa Bay Maintenance Dredging

Notice Date
3/5/2025 1:23:26 PM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST SEATTLE SEATTLE WA 98134-2329 USA
 
ZIP Code
98134-2329
 
Solicitation Number
W912DW25Z157S
 
Response Due
3/21/2025 10:00:00 AM
 
Archive Date
04/05/2025
 
Point of Contact
Geraldine L. Kemp, Scott Britt
 
E-Mail Address
Geraldine.L.Kemp@usace.army.mil, scott.w.britt@usace.army.mil
(Geraldine.L.Kemp@usace.army.mil, scott.w.britt@usace.army.mil)
 
Description
This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below. Construction Project: Pre-solicitation Notice Number: W912DW25Z157S The magnitude of construction is estimated to be between $1,000,000 and $5,000,000. The resulting contract will be firm-fixed-price. FY25 Willapa Bay Maintenance Dredging Project Details: USACE Seattle District has a need for a construction dredging, project entitled FY25 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington: (1) the entrance to Tokeland Marina; (2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2025 and all in-water work must be completed by 15 Feb 2026. The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland). In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay. Dredged material will be disposed via bottom-dump barge at the Cape Shoalwater and/or South Channel open-water disposal locations within Willapa Bay. The work window varies by project features, but ranges between 16 July through 15 Feb of any given calendar year for each specific project feature. The in-water work windows are as follows: � Tokeland Marina: 16 July 2025 through 15 February 2026 � Nahcotta: 16 July 2025 through 01 February 2026 � Bay Center and Palix River: 16 July 2025 through 30 September 2025 Access to/from Willapa Bay requires transit of the Willapa Bar, an unmaintained and unprotected entrance from the Pacific Ocean with dynamic shoals, strong tidal currents, and challenging weather conditions. Furthermore, marine transit within Willapa Bay between project features and dredged material disposal sites requires transit through similar unmaintained and often shallow water depths. Potential risk exists for vessel groundings or accidents. Aids-to-Navigation across the Willapa bar have been removed as they are no longer reliable due to dynamic shoaling conditions. In all locations, shoals are present and shift depending on environmental conditions including tides and storms. This performance window includes the worst season for storm and marine conditions. Contractors should expect difficult mobilization, demobilization, and construction conditions. See the forthcoming solicitation for details about bid submission and virtual bid opening. The NAICS code for this procurement is 237990, Dredging and Surface Cleanup, and the associated small business size standard is $37,000,000 in average annual receipts. Offerors are responsible for checking for any update(s) to the Notice/Solicitation. The Government is not responsible for any loss of Internet connectivity or for an offeror's inability to access the document(s) posted at the referenced website. To obtain automatic notifications of updates to this notice, you must log in to www.beta.SAM.gov and add the solicitation to your Watchlist. If you would like to list your firm so others can see you are an interested vendor, you must click the �Add Me to Interested Vendors� button in the listing for this solicitation on www.beta.SAM.gov. IMPORTANT NOTICE: All contractors proposing on Department of Defense (DoD) solicitations must be registered in the System for Award Management (SAM) database prior to award of a contract. The purpose of this database is to provide basic business information and capabilities to the Government. The SAM website can be accessed at www.sam.gov. Contractors are encouraged to register as soon as possible. All new contracts can be made ONLY to contractors who are registered in SAM. This requirement applies to all DoD contract awards.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8c73bd83156c4405aa9aeef2bf27f5db/view)
 
Place of Performance
Address: WA, USA
Country: USA
 
Record
SN07361703-F 20250307/250307070529 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.