Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 09, 2025 SAM #8475
SOLICITATION NOTICE

Y -- GRADING, DRAINAGE AND PAVEMENT CONSTRUCTION, MAINTENANCE, AND REPAIRS POSTWIDE FORT NOVOSEL, ALABAMA

Notice Date
2/7/2025 10:26:19 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
W6QM MICC-FDO FT EUSTIS FORT EUSTIS VA 23604-5538 USA
 
ZIP Code
23604-5538
 
Solicitation Number
W911S025BA0001
 
Response Due
3/10/2025 7:00:00 AM
 
Archive Date
03/25/2025
 
Point of Contact
Edward WojtanIII
 
E-Mail Address
edward.w.wojtan2.Civ@army.mil
(edward.w.wojtan2.Civ@army.mil)
 
Description
The Contractor shall provide all labor, materials, equipment, supervision, transportation, and incidentals, except as specified herein as Government furnished, to perform all operations in connection with the grading, drainage, and paving required to construct, repair and maintain roads and parking lots at various locations on Fort Novosel property as directed by the Directorate of Public Works (DPW). This work is governed by the applicable drawings and these specifications are subject to the terms and conditions of the contract. Drawings of the areas to be paved shall be submitted to the Contractor with individual task orders as required. All drawings provided to the Contractor are for reference/information only and may or may not be current or to scale. The Contractor shall provide any/all deviations to accepted local, state, and federal building practices/codes to the attention of the Construction Inspector and Contracting Officers Representative for review/consideration by the government. The Contractor shall be responsible for obtaining utility spotting/location and permits that may be required by Environmental Considerations FB-144R. If any work done by the contractor is not according to specifications listed below, that work shall be re-done per specs. The re-work shall be done at the contractor�s expense. General survey and layout requirements for existing roadways overlays, roadway widening, drainage structures and parking lot overlays shall be part of contractors bid. Where layout and engineering work shall be required for establishing new roadway, parking lots and site work the contractor and government representative shall reach an agreed time frame during the scoping of project. This cost shall be covered by the Field Engineering and Layout bid item shown on bid schedule. When required, the Contractor is to provide the necessary documentation in order to obtain a NPDES permit for the new construction. When all work is complete, the Contractor shall be required to provide the DPW with a complete set of As-Built drawings (both electronic and hard copy).
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d8a60717a6254de48523ad82e209e7ff/view)
 
Place of Performance
Address: Fort Novosel, AL 36362, USA
Zip Code: 36362
Country: USA
 
Record
SN07336782-F 20250209/250207230029 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.