SOLICITATION NOTICE
41 -- Walk In Fridge & Freezer
- Notice Date
- 2/4/2025 4:50:44 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 333415
— Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Contracting Office
- FA4830 23 CONS CC MOODY AFB GA 31699-1700 USA
- ZIP Code
- 31699-1700
- Solicitation Number
- FA483025Q0006
- Response Due
- 2/17/2025 10:00:00 AM
- Archive Date
- 03/04/2025
- Point of Contact
- June Alba, Phone: 2292572053, Maria Jimenez, Phone: 2292574704
- E-Mail Address
-
june.alba@us.af.mil, maria.jimenez.5@us.af.mil
(june.alba@us.af.mil, maria.jimenez.5@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- UPDATE AS OF FEBRUARY 4, 2025: AMENDMENT NOTICE Please review the changes outlined below: An additional site visit has been scheduled for February 11th at 2:00 PM EST. Base access documents must be submitted by February 10th at 3:00 PM EST at the latest. The deadline for submitting questions and answers has been set for February 14th at 1:00 PM EST. The offer due date has been extended to February 17, 2025, at 1:00 PM EST. IMPORTANT NOTE: Due to a redefinition of the requirement, all previously submitted quotes are no longer valid and will not be considered. To be considered for this requirement moving forward, new quotes must be resubmitted. ______________________________________________ GENERAL STATEMENT: This is a combined synopsis/solicitation for commercial items issued by the 23d Contracting Squadron, Moody AFB, Georgia. This announcement constitutes the only solicitation being issued for the requirement described herein. The Moody AFB Refrigerator and Freezer Combination Unit located at 4251 George St, Bldg. 901, Moody AFB, GA 31699 requires replacement. 23d FSS requires full replacement of the current refrigerator and freezer combination unit. All existing equipment to include current walk-in box unit and condenser units require replacement and updated to current codes. The removal and disposal of old unit and condenser units. Statement of Work: Walk-in Refrigerator/Freezer Unit Installation Project Introduction The purpose of this Statement of Work (SOW) is to outline the requirements for the installation of a walk-in refrigerator/freezer unit at Moody Field Club. The selected Contractor shall provide all necessary equipment, labor, and services to complete the project in accordance with the specifications and requirements outlined in this document. Scope of Work The Contractor shall provide and install a 2-compartment walk-in refrigerator and freezer unit with the following specifications: Size: 11'W x 29'L x 7'7""H Walk-in Cooler Refrigeration Unit: 115v/230v, 1ph Walk-in Freezer Refrigeration Unit: 230v/230v, 1ph Compartment size ratio: 2:1, with two-thirds of the space allocated to refrigeration and one-third to freezing Floor-integrated installation Doors hinged on the right side, opening from the left The Contractor shall also provide all necessary equipment and supplies, including: Shipping and delivery of all items Installation of all components Demolition and removal of existing equipment Equipment rentals relevant to the installation process System start-up and on-site training Sprinkler system included/installed with unit Salient Characteristics The walk-in unit shall have the following salient characteristics: Size of freezer: minimum 11' to maximum 12' side to side Floor-integrated installation Doors hinged on the right side, opening from the left Civil Engineering Requirements The Contractor shall ensure compliance with all applicable Civil Engineering (CE) regulations and standards throughout the project duration, including prior to and following project completion, as a condition precedent to payment. The Contractor shall restore any modifications or alterations made to the existing building during the project to their original or equivalent condition upon completion. Specific Requirements The Contractor shall ensure that the Fridge/Freezer units are properly sealed and reintegrated into the building's infrastructure, restoring them to their original condition, to prevent any potential damage or compromise to the building's structure or systems. Project Schedule The project shall be completed by 30 April 2025. Warranty The Contractor shall provide a standard 1-year warranty for all equipment and workmanship. Existing Conditions Existing concrete pad shall be re-used for the installation of the new unit. Temporary removal and reinstallation of satellite dish Working Hours The Contractor shall work within the following hours: Monday to Friday: 8:00 AM to 5:00 PM Saturday and Sunday: with prior approval from the facility manager, with minimum 24 hours' notice in writing. Submission Requirements To be considered for this project, the Contractor shall submit the following documents with their quote: Statement of Work Technical specification of unit (blueprint/drawing) Failure to provide these documents may result in the submission being excluded from technical evaluation and consideration for this requirement. By submitting a quote for this project, the Contractor acknowledges that they have read, understood, and will comply with all the requirements outlined in this SOW. *Additional* SITE VISIT: A site visit will be held on Tuesday February 11 2025 at 2:00 PM EST. While attendance is NOT mandatory, it is HIGHLY recommended. Vendors are encouraged to inspect the site in order to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance to the extent that information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Please arrive at the Moody Air Force Base Visitor's Center no later than 1:30 PM EST for check-in (required for all contractors prior to entering the base) to ensure on time arrival for the site visit. Important Notice: Site Visit Attendance Protocol Please be advised that ALL contractors planning to attend the site visit at Moody AFB are required to notify SSgt Alba prior to their visit, regardless of their possession of a Common Access Card (CAC) or other forms of identification that grant access to the base. This notification is mandatory to ensure an accurate head count of contractors attending the site visit. For completing the attached base pass forms please put your business name next to the ""Prime Contractor"" spot (where ABCD is present). Replace the name John Doe with the full name of the member requesting base access for the sitevisit, include date of birth (SSN is NOT to be added on the form but may be needed for check-in) and company for all additional members that may be attending. When complete,email the base pass to june.alba@us.af.mil no later than COB Monday February 10, 2025 at 3 PM EST. See Base Map for directions to the meeting point at Moody AFB. Notice to Offeror(s)/Supplier(s): The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/f9453e320cb144f88895578283bed749/view)
- Place of Performance
- Address: Moody AFB, GA 31699, USA
- Zip Code: 31699
- Country: USA
- Zip Code: 31699
- Record
- SN07332199-F 20250206/250204230032 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |