Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 06, 2025 SAM #8472
SOLICITATION NOTICE

Y -- NM BR AAO ELBU(1) Elephant Butte Historic Roads

Notice Date
2/4/2025 7:57:30 AM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24B000011
 
Response Due
2/11/2025 1:00:00 PM
 
Archive Date
05/13/2025
 
Point of Contact
Douglas Whitcomb, Ryan Phillips
 
E-Mail Address
CFLAcquisitions@dot.gov, cflacquisitions@dot.gov
(CFLAcquisitions@dot.gov, cflacquisitions@dot.gov)
 
Small Business Set-Aside
HZC Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
 
Description
PROJECT NUMBER: NM BR AAO ELBU(1) PROJECT NAME: Elephant Butte Historic Roads PROJECT DESCRIPTION: The Elephant Butte Dam approximately 4 miles east of Truth or Consequences, New Mexico, in Sierra County. The Elephant Butte Lake State Park which is managed by NM State Parks under a lease agreement with the U.S. Bureau of Reclamation. The project is located at the southern end of the Elephant Butte Reservoir and includes the Damsite area and Paseo del Rio. The Damsite area includes visitor amenities, a day use area, camping, casitas, and houses to rent. Paseo del Rio offers campsites, river access, hiking and biking trails, and historic information boards. Roads within the historic district also provide access to the largest marina at Elephant Butte Reservoir. SCOPE OF THE WORK: The project will use asphalt and aggregate base to resurface, restore, and rehabilitate multiple road segments within the Elephant Butte Historic District including: Dam Site Winding Road A/B, Ruins Road, Hospital Canyon Road A/B, Dam Site Entrance Road, unpaved Dam Site Marina Entrance Road, and Paseo Del Rio Campground Access Road. The Paseo Del Rio River Access Road has native surfacing but will be improved with aggregate surfacing. Six paved parking lots will be rehabilitated and repaved. Four additional gravel/native/paved parking lots will be rehabilitated with aggregate surfacing. This project is separated into a base Schedule A, along with two Options, X and Y, to maximize the work that can be completed with the available funds. Schedule A Includes: � Hospital Canyon Road A and B � Dam Site Entrance Road � Winding Road and Approach Roads � Paseo Del Rio Campground Access Road and Approach Roads � Dam Site Upper East and Upper West Parking � Dam Site Recreation Area Restaurant parking and Overflow Parking � Paseo Del Rio Recreation Area Highway 51 River Access Parking � Paseo Del Rio Recreation Area Campground Comfort Station Parking � Old Fish Hatchery Parking � Winding Road Parking Option X includes: � Ruins Road Option Y includes: � Dam Site Marina Entrance Road (concrete) � Dam Site Marina Entrance Road (unpaved) � Dam Site Marina South Parking
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a0571f5ee1d7448f9b274db6f0f67355/view)
 
Place of Performance
Address: Elephant Butte, NM, USA
Country: USA
 
Record
SN07332000-F 20250206/250204230031 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.