SOLICITATION NOTICE
Y -- P-1238, CONSTRUCTION OF GRID STABILITY AND RESILIENCY 10 MW, BATTERY ENERGY STORAGE SYSTEMS, MARINE CORPS AIR GROUND COMBAT CENTER (MCAGCC), TWENTYNINE PALMS, CA
- Notice Date
- 1/29/2025 6:42:07 AM
- Notice Type
- Solicitation
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- NAVFACSYSCOM SOUTHWEST SAN DIEGO CA 92132-0001 USA
- ZIP Code
- 92132-0001
- Solicitation Number
- N6247324R5227
- Response Due
- 9/27/2024 2:00:00 PM
- Archive Date
- 12/30/2025
- Point of Contact
- Kathryn Cranford, Phone: 6197054644, Victor Mariscal, Phone: 6197054657
- E-Mail Address
-
kathryn.r.cranford.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil
(kathryn.r.cranford.civ@us.navy.mil, victor.m.mariscal.civ@us.navy.mil)
- Description
- This acquisition will result in an unrestricted full and open Firm-Fixed Price (FFP) Design-Build contract for the design and construction of a total of 8.5 MW(5.5MW at cogeneration site 1 and 3.0MW at cogeneration site 2) of Battery Energy Storage Systems (BESS) at two (2) locations on MCAGCC, Twentynine Palms, California (P-1238). Each of the estimated 30 BESS (each of which will include high energy density batteries, bidirectional inverters, and the associated controls) will be a standalone modular packaged unit connected to one or more solar photovoltaic (PV) arrays. The BESS will be connected to the solar PV systems for clean energy charging as well as to the installation's electric distribution system for utility power or on-site cogeneration system charging. The BESS will be tied into the installation's microgrid (being built via project P-1232) so the battery energy can be discharged to level solar PV variability and stabilize the grid (electrical distribution system reliability), provide power to support black-start and islanding events (energy resilience), and reduce energy costs during peak demand/energy pricing periods (energy management/efficiency). Also, the BESS controls will be accredited to ensure the energy systems remain cyber secure. The goal for this project is to integrate BESS into an electrical distribution microgrid on MCAGCC. The project installs and fully permits new BESS capable of parallel operation, each located in proximity to existing PV systems.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/e3d591e2534d4e039c4ff1c15b644df2/view)
- Place of Performance
- Address: Twentynine Palms, CA 92277, USA
- Zip Code: 92277
- Country: USA
- Zip Code: 92277
- Record
- SN07326385-F 20250131/250129230107 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |