Z -- 512A5-25-003 Repair 23H Fire Damage

Notice Date
1/29/2025 11:37:48 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
245-NETWORK CONTRACT OFFICE 5 (36C245) LINTHICUM MD 21090 USA
 
ZIP Code
21090
 
Solicitation Number
36C24525B0003
 
Response Due
2/25/2025 10:00:00 AM
 
Archive Date
04/26/2025
 
Point of Contact
Brandon S Parker, Contract Specialist
 
E-Mail Address
Brandon.Parker2@va.gov
(Brandon.Parker2@va.gov)
 
Awardee
null
 
Description
SCOPE OF WORK PROJECT DATA: VA Project Title: Building 23H Fire Damage Repairs VA Project No: 512A5-25-003 VA Facility: Perry Point VA Medical Center Perry, Point, MD Period of Performance: 90 calendar days from contract Notice to Proceed Project Background: On the evening of October 23, 2024, a fire occurred located on the roof of Building 23H. The fire was extinguished with no major damages to 23H. There was minor damages and wetted areas from the use of fire hoses. A remediation contractor was engaged to remove all wetted ceiling tiles, wetted carpet, wetted drywall, wetted wall base, and wetted insulation from the project site. A separate contract is now being contemplated to complete the repair/restoration work required to return the damaged building areas to active service use. Work Scope: Work Item 1: The contractor shall provide all supervision, labor, materials, and equipment to replace the acoustical ceiling tiles, flooring, gypsum board walls, and wall base that were previously removed as part of the fire damage cleanup. Attachment 1 contains a detailed breakdown of the projected repair area included in each room for ceiling tiles, flooring, drywall, paint, and wall base. Approximate total areas for repairs under project to be included in bid: 1610 SF of new gypsum board wall installed on existing metal studs/hat channel. 1640 SF of acoustical ceiling tile (including minor repairs to existing suspension grid) 578 LF of rubber wall base 1184 SF of carpet tile and mastic 250 SF of luxury vinyl plank flooring and mastic 6685 SF of wall patching/skim coat and painting. 4th Floor office suite to be fully repainted after wall repairs. Coordinate color selections with COR. Contractor shall include the removal and reinstallation of existing wall paintings, door tags, TV mounts, bulletin boards, and other signage/artwork as required to repair and repaint walls. VA to provide temporary storage location. Contractor to provide and install a new grid-supported HVAC supply diffuser (2x2) with manual damper and flexible ductwork in room 409 to replace one removed during demolition phase. Coordinate with existing duct size. Contractor shall remove and replace all electrical receptacle and switch cover plates within the work area that were damaged during the water damage remediation phase. Replacement cover plates shall be type 302 stainless steel matching the type and color removed. Oversize plates are not acceptable. Contractor shall remove and rebuild the existing 2HR rated UL shaft-wall system (UL U415 System B) around the existing generator exhaust pipe (including 1 Type X gypsum liner panel, 2½ CH metal studs, and 2 layers of 5/8 Type X gypsum board). Contractor shall include all accessories required for the complete installation of all finish systems, including but not limited to stainless-steel flooring transition strips, light-gage or wood furring/blocking, and ACT suspension grid accessories/pieces for repairs. All joints between gypsum board and other materials shall be fully caulked prior to painting. Work areas are currently isolated from the rest of the hospital with temporary partitions (hard wall or plastic sheeting). Contractor shall provide for any supplemental infection control barriers and ICRA preventative measures required by the work. Level 3 Infection Control Risk Assessment (ICRA) Controls (including negative pressure exhaust) will be required during all drywall and flooring work to control dust and fumes. Work Item 2: The contractor shall engage the services of a Maryland State licensed abatement contractor to remove approximately 1300 SF of residual black mastic from previously removed tile flooring on the 4th floor upper level (rooms 406-410 and 4th floor corridor). Existing mastic is non-friable and has been previously scarified by mechanical means, but a residual base layer remains that must be removed by chemical means. VA will provide their own VPIH consultant to conduct background air monitoring and clearance testing for internal purposes. Contractor shall provide their own separate CIH in accordance with OSHA to conduct continuous air monitoring and final TEM clearance after removal of material. Contractor shall provide legal disposal of all asbestos waste per COMAR 26-11-21-08 Asbestos Waste Disposal. Records of hazardous waste disposal (such as manifests, hazardous waste profiles, LDRs) MUST be provided by approved waste transporter and signed by an approved VAMHCS Manifest signer from the VAMHCS Safety Department ONLY. All records provided to COR and VAMHCS GEMS Coordinator at VAMHCSGEMSProgram@va.gov 10-day NESHAPS notification to MDE and the EPA for demolition or renovation (40 CFR § 61.145, Figure 3, Notification of Demolition and Renovation), Provide completed copy to VAMHCS Projects COR. Prepare and submit asbestos abatement plan to VAMHCS Projects COR for approval before proceeding with work. Work Item 3: The contractor shall seal existing penetrations within the work area between floors with the appropriate fire-rated material and/or fire caulking. This scope specifically shall include: Installation of a UL-listed 2hr fireproofing assembly around an existing generator exhaust pipe penetration through the concrete floor at the 2nd, 3rd, and 4th floor levels (located in the corner of room 1G-108, 227, 323, and 409). Approximate floor penetration is roughly 18 x18 with a 12-14 diameter insulated pipe passing though. Basis of Design UL Firestop Assembly shall be C-AJ-5210 . Infill/Fireproofing around all existing radiator steam pipe penetrations within the work area. Approximate 4 diameter hole with ½-2 diameter pipe. Basis of Design UL Firestop Assembly shall be C-AJ-1551 . Contractor shall include infill of (2) penetrations at each radiator (located below windows within work area) in proposal. Safety and Environmental Precautions: The Contractor shall comply with all applicable Federal, State, and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees. OSHA and VA CONSTRUCTION SAFETY STANDARDS shall be enforced. Contractor Supervisor must have 30-hour OSHA Construction Safety course. All contractor employees must have 10-hour OSHA Construction Safety course. Follow all ICRA guidelines for dust control during all construction and demolition work. A construction dust Risk Assessment will be conducted by the Medical Center s Infection Control Nurse. Bi-weekly inspections of barriers and work areas will be conducted by Infection Control Nurse, Safety Manager, and COR to enforce implementation of risk assessment. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regards to exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants. The work is in a professional environment, employees must conduct themselves accordingly. Employees shall not use abusive language, carry firearms, or bring alcoholic beverages on site. Employee's dress code shall consist of normal work uniform. Shirts must be worn at all times. No flammable liquids shall be stored or used in the medical center. The Contractor shall receive from the station fire department a permit for all cutting, welding, and soldering. All permits shall be prominently displayed during all construction. Permits must be opened at the start of each activity and closed at the end of each workday. In order to provide for control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. Disposal and/or recycling of all demolished building materials and construction waste per applicable regulations shall be included. Construction Requirements: The Contractor shall have the skills, availability, capacity, and all other required resources required to complete the job on time without delay. All work shall comply with local, state, and federal rules and regulations, and VA technical standards. If not specified, all work shall meet or exceed the specifications of currently installed work. Provide daily on-site project management to coordinate all building trades and provide liaison for construction and VA Project Engineering. Superintendent and Site Safety and Health Officer shall be designated and shall be always present at the project site. All employees of contractor shall comply with VA Security management program and obtain permission of the VA police, be identified by project and employer, and be restricted from unauthorized access. VA issued ID Badges shall be worn by all workers while within the campus boundaries. Contractor shall make all necessary arrangements to obtain the required security investigation for badging prior to commencement of on-site work. VA issued ID Badges shall be always worn by all workers. All equipment and materials shall be approved prior to being brought on job site. Buy American-Construction Materials clause applies to all construction material purchases. Normal work hours are Monday through Friday 7:00 a.m. to 4:30 p.m. Contractor shall make prior arrangements to work earlier or later with Project Manager. VA shall not grant access to sub-contractors; it is the responsibility of the contractor. Unless noted otherwise, all new surface repair work shall match the existing adjacent work to the maximum extent practicable. Contractor shall provide general clean up to construction area daily to the satisfaction of the COR. Warranty on new work shall extend for a period of no less than 1 year from date of final acceptance of project completion per FAR. Attached References: The references noted below supplement this scope of work Attachment 1: 23H Repair Area Estimation Attachment 2: 23H Floor Plans Attachment 3: 512A5-25-003 Combined Specifications -----END OF SCOPE OF WORK-----
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/c6d58139f9f44b99a88798481d2e83d1/view)
 
Record
SN07326064-F 20250131/250129230104 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.