SOLICITATION NOTICE
58 -- ALE-47 Countermeasures Dispenser System (CMDS) Hardware Procurement
- Notice Date
- 12/12/2024 4:48:09 PM
- Notice Type
- Presolicitation
- NAICS
- 334511
— Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
- Contracting Office
- FA8523 AFLCMC WNKD ROBINS AFB GA 31098-1663 USA
- ZIP Code
- 31098-1663
- Solicitation Number
- FA8523-24-R-0007
- Response Due
- 1/15/2025 1:00:00 PM
- Archive Date
- 01/30/2025
- Point of Contact
- Mellissa Smith, Daniel Daniels
- E-Mail Address
-
mellissa.smith@us.af.mil, daniel.daniels.2@us.af.mil
(mellissa.smith@us.af.mil, daniel.daniels.2@us.af.mil)
- Description
- Update 13: 12 December 2024: Vendors who previously requested a copy of the TDP were provided additional drawings on 12/12/2024 Update 12: 2 December 2024: A Question and Answer document (2 Dec 2024 Question and Answers) has been added to the attachments section. Update 11: 14 November 2024: The solicitation response date has been extended from 2 December 2024 to 15 January 2025. Please see amendment 0001 posted in the attachments. Update 10: 5 November 2024: Section L has been reposted. Updated section L includes instructions for utilization of the PPI tool. Information has been added to page 18-26 of the Section L document. Prior version of Section L has been removed from the attachments to prevent duplication. Update 9: 1 November 2024: TM-86-01N has been included in attachments Update 8: 31 October 2024. The final solicitation and all applicable attachments have been posted. Please make note of the RFP return date of 2 December 2024 at 4:00 pm Eastern. - Due to this effort crossing fiscal years, the solicitatiton number has been updated to reflect a Fiscal Year (FY) 2025 solicitation number. The Solicitation number is hereby updated to FA8523-25-R-0002 - An updated Technical Data Package is available for request. When requesting the updated Technical Data Package, please utilize the following instructions: - To request access to the updated Technical Data Package, please send an email request to the points of contact listed on this posting. In the request, please provide your Commercial and Government Entity (CAGE) code and a copy of your DD2345, Militarily Critical Technical Data Agreement. -To prevent duplication, draft RFP attachments have been removed and final solicitation attachments have been added to this posting -Additionally, to address synopsis requirements inadvertently overlooked, IAW FAR 5.207(c)(1)(3)(6)(7) and (9) � the following is applicable to this effort: 1. 5930-01-333-2196 EW / CAGE: 19397/ PN 179720-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 1,803 ea / Production delivery schedule: 6 months 2. 5865-01-334-8349 EW / CAGE: 19397/ PN 179750-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 3,603 ea / Production delivery schedule: 6 months 3. 5865-01-380-8046 EW / CAGE: 22830/ PN 179740-0002 / TO Number 12P3-2ALE47-4 / Estimated total quantity 263 ea / Production delivery schedule: 10 months 4. 5865-01-437-3371 EW / CAGE: 22830/ PN 179730-0005 / TO Number 12P3-2ALE47-4 / Estimated total quantity 382 ea / Production delivery schedule: 12 months 5. 5865-01-437-3373 EW / CAGE: 19397/ PN 179730-0006 / TO Number 12P3-2ALE47-4 / Estimated total quantity 774 ea / Production delivery schedule: 12 months 6. 5865-01-687-1948 EW / CAGE: 98752/ PN 179730-0010 / TO Number 12P3-2ALE47-4 / Estimated total quantity 28 ea / Production delivery schedule: 12 months 7. 5865-01-451-2868 EW / CAGE: 22830/ PN 179250-0003 / TO Number 12P3-2ALE47-4 / Estimated total quantity 3,302 / Production delivery schedule: 12 months 8. 5865-01-527-2187 EW / CAGE: 22830/ PN 179250-0012 / TO Number 12P3-2ALE47-4 / Estimated total quantity 101 ea / Production delivery schedule: 12 months 9. 5998-01-357-0599 EW / CAGE: 19397/ PN 177444-0004 / TO Number 12P3-2ALE47-3&4 / Estimated total quantity 603 ea / Production delivery schedule:12 months 10. 5998-01-357-0600 EW / CAGE: 22830/ PN 177425-0005 / TO Number 12P3-2ALE47-3&4 / Estimated total quantity 603 ea / Production delivery schedule: 12 months 11. 5998-01-357-0601 EW / CAGE: 22830/ PN 177430-0003 / TO Number 12P3-2ALE47-3&4 / Estimated total quantity 503 ea / Production delivery schedule: 12 months 12. 5998-01-357-0602 EW / CAGE: 22830/ PN 177434-0002 / TO Number 12P3-2ALE47-4 / Estimated total quantity 503 ea / Production delivery schedule: 12 months 13. 5998-01-357-0603 EW / CAGE: 22830/ PN 177438-0002 / TO Number 12P3-2ALE47-4 Figure 34/Index 8 / Estimated total quantity 383 ea / Production delivery schedule: 12 months 14. 5998-01-388-7062 EW / CAGE: 19397/ PN 177276-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 123 ea / Production delivery schedule: 12 months 15. 5998-01-333-1980 EW / CAGE: 19397/ PN 176073-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 103 ea / Production delivery schedule: 12 months 16. 5895-01-335-6069 EW / CAGE: 19397/ PN 166179-0001 / TO Number 12P3-2ALE47-3&4 / Estimated total quantity 143 ea / Production delivery schedule: 12 months 17. 5998-01-414-1387 EW / CAGE: 19397/ PN 175830-0003 / TO Number 12P3-2ALE47-4 / Estimated total quantity 123 ea / Production delivery schedule: 12 months 18. 5998-01-580-9469 EW / CAGE: 3DFH1 / PN 176058-0005 / TO Number 12P3-2ALE47-4, FIG:7, IND:4 / Estimated total quantity 143 ea / Production delivery schedule: 12 months 19. 5998-01-383-8263 EW / CAGE: 22830/ PN 176069-0002 / TO Number 12P3-2ALE47-4 / Estimated total quantity 63 ea / Production delivery schedule: 12 months 20. 5998-01-580-7506 EW / CAGE: 3DFH1/ PN 174265-0004 / TO Number 12P3-2ALE47-4, FIG:14, IND:10 / Estimated total quantity 64 ea / Production delivery schedule: 12 months 21. 5998-01-439-9525 EW / CAGE: 22830/ PN 174260-0009 / TO Number 12P3-2ALE47-4 / Estimated total quantity 117 ea / Production delivery schedule: 12 months 22. 5998-01-702-8446 EW/ CAGE: 98752/ PN 174260-0020 / TO Number 12P3-2ALE47-4 / Estimated total quantity 12 ea / Production delivery schedule: 12 months 23. 5998-01-603-6648 EW / CAGE: 98752/ PN 174255-0009 / TO Number 12P3-2ALE-47-4 / Estimated total quantity 24 ea / Production delivery schedule: 12 months 24. 5998-01-334-2219 EW / CAGE: 19397 / PN 176150-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 23 ea / Production delivery schedule: 12 months 25. 5998-01-337-7526 EW / CAGE: 22830/ PN 176130-0002 / TO Number 12P3-2ALE47-4 / Estimated total quantity 83 ea / Production delivery schedule: 12 months 26. 5998-01-335-3197 EW / CAGE: 19397/ PN 176096-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 23 ea / Production delivery schedule: 12 months 27. 5998-01-335-3198 EW / CAGE: 19397/ PN 176095-0001 / TO Number 12P3-2ALE47-4 / Estimated total quantity 23 ea / Production delivery schedule: 12 months 28. 5865-01-333-4735 EW / CAGE: 19397/ PN 176079-0003 / TO Number 12P3-2ALE47-4 / Estimated total quantity 24 ea / Production delivery schedule: 12 months 29. 5998-01-336-3867 EW / CAGE: 22830/ PN 174240-0004 / TO Number 12P3-2ALE47-4 / Estimated total quantity 54 ea / Production delivery schedule: 12 months 30. 5998-01-336-9190 EW / CAGE: 22830/ PN 179735-0005 / TO Number 12P3-2ALE47-4 / Estimated total quantity 129 ea / Production delivery schedule: 12 months 31. 5935-01-334-3230 EW / CAGE: 19397/ PN 176524-0001 / TO Number 12P3-2ALE47-4 Figure 23/Index 10 / Estimated total quantity 23 ea / Production delivery schedule: 12 months 32. 5998-01-357-8993 EW / CAGE: 19397/ PN 177466-0002 / TO Number 12P3-2ALE47-4 / Estimated total quantity 23 ea / Production delivery schedule: 12 months Update 7: 30 August 2024. Date referenced in update 5 has been delayed. Please continue to monitor this posting for updates. Update 6: 19 August 2024 - Question and Answer (Q&A) document dated 19 August 2024 posted. Update 5: 16 August 2024 - Anticipated RFP release date of 12-16 August as referenced in posted Questions and Answers 10 July 2024 is hereby updated. Anticipated RFP release date is estimated to be published at end of month (August). Continue to monitor this posting for updates. Update 4: 11 July 2024 � Technical data is available for request. To request access, please send an email request to the points of contact listed on this posting. In the request, please provide your Commercial and Government Entity (CAGE) code and a copy of your DD2345, Militarily Critical Technical Data Agreement. Update 3: 10 July 2024 - The DRAFT RFP timeframe has been extended to 24 July 2024. DRAFT RFP Question and Answer document #2 ""Questions and Answers 10 July 2024"" has been uploaded. Update 2: 17 June 2024 - DRAFT RFP Question and Answer document has been uploaded Update 1: 20 May 2024 � DRAFT RFP and applicable attachments have been uploaded. The DRAFT RFP will be posted for 30 days ending 19 June 2024 at 4:00 pm Eastern. Questions regarding the DRAFT RFP shall be submitted to Mellissa Smith ( mellissa.smith@us.af.mil ) and Daniel Daniels ( daniel.daniels.2@us.af.mil ). Questions will be compiled with answers posted weekly. This is a notice of intent that Air Force Life Cycle Management Center (AFLCMC)/WNKD anticipates issuing a solicitation for the AN/ALE-47 Countermeasures Dispenser System (CMDS). The AN/ALE-47 CMDS is an integrated, threat-adaptive, reprogrammable, computer-controlled airborne defensive system. The AN/ALE-47 dispenses countermeasure decoys (Chaff, Flare, and others) against radar and infrared homing threats to enhance aircraft survivability. The AN/ALE-47 CMDS procurable under this effort consists of the Line Replaceable Units (LRUs), each of which consist of lower assemblies called Shop Replaceable Units (SRUs). The Air Force and Army support the AN/ALE-47 with two-level maintenance concept. The Navy supports the AN/ALE-47 with a three-level maintenance concept. Warner Robins Air Logistics Complex is the organic depot for Air Force, Army, and Navy AN/ALE-47 hardware and Operational Flight Program (OFP) software. Contractors with one or more unqualified LRUs may qualify the LRUs by meeting Pre-Production Requirements. Pre-Production encompasses all efforts required to demonstrate that the Contractor is prepared for production. Pre-Production includes developing Government approved Environmental Stress Screening (ESS) procedures, developing Government approved ATPs for LRUs and SRUs, performing ESS test on First Article LRUs, performing Acceptance Test on SRUs and First Article LRUs, submitting successful ESS reports and Acceptance Test reports for Government approval, conducting Interchangeability Test, submitting First Article LRUs for Government Inspection And Test, and obtaining Government approval of First Article LRUs. Government Inspection and Test will include dimensional verification, Interchangeability Test, LRU testing, and some software testing for LRUs containing software. The Government reserves the right not to award production orders until all LRUs are qualified. The Contractor must obtain a delivery order from the Government Procuring Contracting Officer (PCO) before commencement of production. The Contractor shall fabricate, integrate, test, and deliver LRUs and SRUs in accordance with the quantities on each delivery order. The Contractor shall maintain current test equipment calibration in accordance with the requirements of ANSI/NCSL-Z540.3. The Contractor shall maintain a minimum capability requirement which will include maintained equipment and qualified personnel. This effort is anticipated to be issued for a 12-month basic, and four (4) 12-month ordering periods. A Firm-Fixed Price pricing arrangement is anticipated. Should an unqualified contractor be awarded the contract, a 36-month qualification period will occur in place of the 12-month basic. This acquisition will utilize the Tradeoff source selection procedures in accordance with FAR 15.101-1 and 15.3 as supplemented by the DoD Source Selection Procedures referenced in DFARS 215.300 and the DAFFARS Mandatory Procedures 5315.3 to make an integrated assessment for a best value award decision. Offerors shall prepare their proposals in accordance with mandatory, explicit, and detailed instructions contained in the RFP. The Government will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. It is anticipated that the RFP will be released on or around 9 April 2024 and anticipated award on or around June 2025. The RFP will be posted to SAM.gov. All responsible sources may submit a proposal. Foreign companies are not permitted to participate in the competition. Interested vendors may notify the POCs listed at the end of this synopsis with any questions. Please note, all questions are requested to be submitted in writing via email for documentation purposes�NO TELEPHONIC QUESTIONS. Interested vendors are encouraged to register to receive notification for solicitation and all amendments/revisions, and to check SAM.gov prior to submission of their proposal.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4bfc9b125e5045589b87635436304436/view)
- Record
- SN07290545-F 20241214/241212230118 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |