Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 04, 2024 SAM #8408
MODIFICATION

N -- Move and install furniture at the VBA VR&E Office Fort Walton Beach, FL

Notice Date
12/2/2024 6:09:52 AM
 
Notice Type
Solicitation
 
NAICS
238390 — Other Building Finishing Contractors
 
Contracting Office
VETERANS BENEFITS ADMIN (36C10D) WASHINGTON DC 20006 USA
 
ZIP Code
20006
 
Solicitation Number
36C10D25Q0032
 
Response Due
12/13/2024 9:00:00 AM
 
Archive Date
12/23/2024
 
Point of Contact
Tiffany L Garfield, Contract Specialist
 
E-Mail Address
tiffany.garfield@va.gov
(tiffany.garfield@va.gov)
 
Awardee
null
 
Description
Evaluation Criteria Factor #1 Technical Approach - Schedule Each offeror shall submit a technical approach narrative which demonstrates how the offeror intends to accomplish the requirements as stated in the Statement of Work. Submit a preliminary schedule for performance satisfying the requirements of this project. A practicable schedule showing the pick-up at Montgomery, AL, Delivery to Fort Walton Beach, FL and Assembly/Installation in accordance with the period of performance in the Statement of Work. Rating Scheme - The technical approach standard will receive one of the ratings defined below. These ratings will be used to determine an overall rating for the project approach factor. A rating of unacceptable for either standard will equate to an unacceptable rating for the project approach factor and the proposal will not be further evaluated. Adjectival Rating Standards Rating Description Acceptable Proposal clearly meets the requirements of the solicitation. Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation. Evaluation Factor #2 - Past Performance (Similar projects). Evaluation of past performance- A maximum of three (3) past performance projects completed by the Prime Contractor shall be submitted to the Government. Each past performance shall contain the following: Brief project description. List of subcontractors. Initial/Final award amount. State any change orders if occurred during the project performance. Project Contracting Officer Representative or Client. The projects shall be recent (completion date to be within 5 years of the solicitation release date), relevant, and meet or exceed the proposed magnitude and scope of the proposed project. Offerors without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, unknown shall be considered neutral. If a rating of unacceptable for the past performance factor is assessed, the entire proposal will be determined unacceptable, and will not be further evaluated. Past Performance Ratings Rating Description Acceptable The Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror s performance record is unknown. Unacceptable Based on the offeror s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort Neutral Offerors without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors. The evaluation will be conducted by receiving all proposals submitted and reviewing the lowest price proposal to verify that that proposal meets all solicitation requirements to include the evaluation criteria. If that proposal does not meet the solicitation requirements, then the evaluation team will move on to reviewing the next lowest proposal and proceed in the same manner until a proposal meets all requirements.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a3bc48bc51ac492c9e456474487182b7/view)
 
Record
SN07278521-F 20241204/241202230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.