Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 01, 2024 SAM #8375
SOLICITATION NOTICE

Y -- TX FLAP FM 709(1) � Access to Navarro Mills Lake

Notice Date
10/30/2024 1:50:59 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000037
 
Response Due
10/30/2024 1:00:00 PM
 
Archive Date
11/30/2024
 
Point of Contact
Stephanie Navarro, Jorey Deml
 
E-Mail Address
CFLAcquisitions@dot.gov, cflacquisitions@dot.gov
(CFLAcquisitions@dot.gov, cflacquisitions@dot.gov)
 
Description
PROJECT NUMBER: TX FLAP FM 709(1) PROJECT NAME: Navarro Mills Lake Road PROJECT DESCRIPTION: The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709.� The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road.� The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction. The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP).� In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety. PRINCIPAL WORK ITEMS: 7,820 Embankment Construction 29,000 tons of Aggregate base 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement) 7000 Tons of Asphalt Concrete Pavement 4000 hours of temporary traffic control, flagger 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel. 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert 390 linear feet, 30-inch pipe culvert (concrete) 660 linear feet, 24-inch pipe culvert (concrete) 210 linear feet, 54-inch pipe culvert (concrete) ANTICIPATED SCHEDULE:� Advertise:� September 2024 Award:� Fall 2024 Construction:� November 2024 �August 2025 ESTIMATED COST RANGE:� The anticipated cost range is between $5,000,000 and $10,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/93b362587e124406a681fc4b37af7c55/view)
 
Place of Performance
Address: Dawson, TX, USA
Country: USA
 
Record
SN07252446-F 20241101/241030230102 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.