SOLICITATION NOTICE
36 -- CHLORINATOR, ECG
- Notice Date
- 10/10/2024 1:33:43 AM
- Notice Type
- Solicitation
- NAICS
- 333998
—
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010425QFA15
- Response Due
- 10/11/2024 1:30:00 PM
- Archive Date
- 10/26/2024
- Point of Contact
- Telephone: 7176052379
- E-Mail Address
-
SCOTT.YOUNGBLOOD@NAVY.MIL
(SCOTT.YOUNGBLOOD@NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N743.30|WVK|717-605-2379|SCOTT.R.YOUNGBLOOD2.CIV@US.NAVY.MIL| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See specification sections C and E.| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| GENERAL INFORMATION-FOB-DESTINATION|1|B| REPAIR DELIVERY (FIRM FIXED PRICE)|1|10 MONTHS| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Stand-Alone Receiving Report- Certifications Combo- Receiving Report & Invoice- Material|N/A|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD|TBD| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| EQUAL OPPORTUNITY (SEP 2016)|2||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from date of delivery|one year from date of delivery||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333988|500|||||||||||| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||| 1. SCOPE 1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material. 1.2 ;ECG Refurbish kit, NSN 1H 3655-01-633-0242 will be supplied to HAMILTON SUNDSTRAND CORP.; 1.3 ;ECG Refurbish kit, NSN 1H 3655-01-633-0242 will be supplied to HAMILTON SUNDSTRAND CORP.; 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.2 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254). The classified documents and security level are: ;EB-3204 - CONFIDENTIAL; 2.3 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions. 2.3.1 Specification Revisions - The specification revisions listed under ""Documents References"" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009, R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract. 2.3.2 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 2.3.3 The documents and drawings listed below under DRAWING NO. are not provided with this Contract/Purchase order. DRAWING NO CAGE REV DISTR CD ;SV799150 73030 V B SV799119 73030 N B SV799133 73030 P B SV799124 73030 H B SV799128 73030 E B SV799129 73030 K B SV799130 73030 H B SV799125 73030 J B SV799127 73030 K B SVS799124 73030 F B SVS799125 73030 F B SVS799127 73030 F B SVS799128 73030 G B SVS799129 73030 G B SVS799130 73030 H B SVHS13255 73030 C B; 2.3.4 ""Document References"" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order. DRAWING DATA=EB-3204 |96169| -|SP |D|0001 | -|00026|0000000 DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | | DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01| DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | | DOCUMENT REF DATA=ASTM-B150 | | | |190401|A| | | DOCUMENT REF DATA=ASTM-B348 | | | |211101|A| | | DOCUMENT REF DATA=ASTM-B381 | | | |130701|A| | | DOCUMENT REF DATA=ASTM-B446 | | | |190401|A| | | DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | | DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | | DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | | DOCUMENT REF DATA=SAE AMS 2380 | | |F |080401|A| | | DOCUMENT REF DATA=SAE AMS 2643 | | |C |020101|A| | | DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | | DOCUMENT REF DATA=ISO10012 | | | |030415|A| | | DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | | DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | | DOCUMENT REF DATA=MIL-DTL-24231 | | |E |130426|A| | | DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | | DOCUMENT REF DATA=A-A-59004 | | |B |081118|A| | | DOCUMENT REF DATA=SAE AMS-STD-2154 | | |D |200401|A| | | DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | | DOCUMENT REF DATA=0900-LP-001-7000 | | | |810101|C| |01| DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | | DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | | DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | | 3. REQUIREMENTS 3.1 REFURBISHED MATERIAL STATEMENT OF WORK (REPAIR SOW) - 3.1.1 INSPECTION - Clean and determine if refurbishment is possible. At disassembly, the Contractor must record all identifying markings found on the parts of each assembly. The Contractor must maintain traceability of these markingsto each unit throughout refurbishment. 3.1.2 RE-USEABLE PARTS - Any parts of the original assembly that are useable (replacement is not necessary), may be utilized as initially supplied. 3.1.3 NON-USEABLE PARTS - Any parts of the original assembly that are not usable (replacement is necessary) must be in accordance with this TDP (Technical Data Package). 3.1.4 REFURBISHMENT - Upon completion of inspection, this item must be refurbished to be in accordance with ;Hamilton Standard Drawing SV799150; , except as amplified or modified herein. This applies to all ""Parts Requiring Certification"" as identified elsewhere in this Contract/Purchase Order. 3.1.5 Additional SOW Requirements - ;N/A; 3.2 ;The primer called out in Hamilton Standard drawing SV799125 drawing note 4 must be Loctite Primer N or equal. Primers containing Methanol may not be used.; 3.3 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise: Part - ;Receptacle Bodies for Part Numbers SV799119-1 and SV799119-2; Material - ;ASTM B446, Alloy UNS N06625, Grade 1 and meeting the requirements of Note 9 of Drawing SV799119; Part - ;Locknuts and Spacers for Part Numbers SV799119-1 and SV799119-2; Material - ;ASTM B150, UNS C63200; Part - ;Receptacle Body for Part Number SV799133-1; Material - ;ASTM B446, Alloy UNS N06625, Grade 1 and meeting the requirements of Note 9 of Drawing SV799133; Part - ;Locknut and Spacer for Part Number SV799133-1; Material - ;ASTM B150, UNS C63200; Part - ;Anode, Find 2 on Drawing SV799129; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799129; ;Chemical and mechanical certification is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Part - ;Generator Cover, Find 7 on Drawing SV799150; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799128; Part - ;Cathode, Find 2 on Drawing SV799130; Material - ;ASTM-B348, Grade 2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799130; Part - ;Base, Find 2 on Drawing SV799127; Material - ;ASTM-B381, Grade F2, Annealed and meeting the requirements of Notes 4 and 6 of Drawing SVS799127; Part - ;Cover, Find 2 on Drawing SV799124; Material - ;ASTM B381, Grade F2, Annealed and meeting the requirements of Notes 4 and 6 of Drawing SVS799124; Part - ;Containment Vessel Body, Find 2 on Drawing SV799125; Material - ;ASTM B381, Grade F2, Annealed and meeting the requirements of Notes 3 and 5 of Drawing SVS799125; Part - ;Stud, Find 3 on Drawing SV799127; Stud, Find 3 on Drawing SV799125; Hex Head Bolts, Find 43 and Find 47 on Drawing SV799150; and Hex Nuts, Find 42 and Find 45 on Drawing SV799150; Material - ;ASTM-B446, Grade 1; 3.4 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings and specifications is still required, but certifications are only required as listed below. Test - Non-Destructive Tests Item - ;Weld Repair and/or Production Weld (as applicable); Performance - Per applicable fabrication specification Acceptance - Per applicable fabrication specification Test - ;Hydrostatic Test; Item - ;Receptacle and Cable-Power, Finds 51 and 61 on Drawing SV799150; Performance - ;Notes 18 and 23 on Drawing SV799119; Acceptance - ;Notes 18 and 23 on Drawing SV799119; Test - ;Hydrostatic Test; Item - ;Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Notes 18 and 23 on Drawing SV799133; Acceptance - ;Notes 18 and 23 on Drawing SV799133; Test - ;Dielectric-Strength Test; Item - ;Receptacle and Cable-Power, Find 51 and Find 61 on Drawing SV799150; Performance - ;Note 24 on Drawing SV799119; Acceptance - ;Note 24 on Drawing SV799119; Test - ;Dielectric-Strength Test; Item - ;Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Note 24 on Drawing SV799133; Acceptance - ;Note 24 on Drawing SV799133; Test - ;Non-Destructive Bonding Test; Item - ;Receptacle and Cable-Power, Find 51 and Find 61 and Receptacle and Cable-Liquid Sensor, Find 62 on Drawing SV799150; Performance - ;Figure 1 of MIL-DTL-24231; Acceptance - ;Figure 1 of MIL-DTL-24231; Test - ;100% Ultrasonic Inspection; Item - ;Starting material for Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV799124; and Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;T9074-AS-GIB-010/271, except that zone testing, front half, with one half material plus .500 inch standard must be allowed; Acceptance - ;SAE AMS-STD-2154, Table 6, Class A; ;Ultrasonic Inspection is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Test - ;Macrostructure Inspection; Item - ;Starting material for Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV799124; and Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;SAE-AMS-2643; Acceptance - ;SAE-AMS-2380, and the macro-grain structure must be equal to or better than level 30; ;Macrostructure Inspection is not required for the Anode, Find 2 on Drawing SV799129, when supplied as Government furnished material.; Test - ;Liquid Penetrant Inspection; Item - ;Stud, Find 3 on Drawing SV799127; Stud; Find 3 on Drawing SV799125; Hex Head Bolts, Find 43 and Find 47 on Drawing SV799150; and Hex Nuts, Find 42 and Find 45 on Drawing SV799150; Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222 Acceptance - MIL-DTL-1222 Test - ;100% Dye Penetrant Inspection; Item - ;Receptacle Bodies for Part Numbers SV799119-1, SV799119-2, and SV799133-1; Anode, Find 2 on Drawing SV799129; Generator Cover, Find 7 on Drawing SV799150; Cathode, Find 2 on Drawing SV799130; Base, Find 2 on Drawing SV799127; Cover, Find 2 on Drawing SV7991 24; Containment Vessel Body, Find 2 on Drawing SV799125; Performance - ;T9074-AS-GIB-010/271; Acceptance - ;MIL-STD-2035; Test - ;Hydrostatic Test; Item - ;Each Assembly; Performance - ;Paragraph 4.1 and 4.4 of Specification SVHS13255; Acceptance - ;Paragraph 4.1 and 4.4 of Specification SVHS13255; Test - ;Leak Test; Item - ;Each Assembly; Performance - ;Paragraph 4.2 and 4.5 of Specification SVHS13255; Acceptance - ;Paragraph 4.2 and 4.5 of Specification SVHS13255; 3.5 ;Contactor must perform a low pressure flow test on each assembly to verify that there are no flow path obstructions.; 3.6 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG / -0 PSIG. For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 50 PSIG. For pressure tests above 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG. The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the following must be used: For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes. For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes. For a test duration of more than 24 hours, the tolerance must be +60 minutes / - 0 minutes. 3.7 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;SVHS13255 Rev C (EB-3204 Rev -); and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the working pressure on the item does not apply and is strictly prohibited. 3.8 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly. 3.9 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria. The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/ 3.10 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent inspection in accordance with ASME B1 series is acceptable. 3.10.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement. 3.10.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22 of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222. 3.10.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system. 3.11 Thread Forming - The following provides the official interpretation of paragraph 4.5.2.7 of MIL-DTL-1222. 3.11.1 In order to qualify for ""Alternate Mechanical Testing"" found in MIL-DTL-1222J paragraph 4.5.2.7 and utilize the mechanical properties for the starting bar stock in lieu of performing yield strength or proof stress testing on finished fasteners, all of the subsequent provisions found in MIL-DTL-1222J paragraphs 4.5.2.7 a through e must be met. If any single provision is not met, all required mechanical testing must be performed on the finished full sized fasteners. These provisions are explained as follows: a. Proper product lot control and traceability must be in place. b. No heat treatment (including hot heading and hot forming), cold forming, drawing, rolling and thread rolling may be performed on the starting bar, fastener blanks or finished fasteners after the completion of the mechanical testing on the starting bar. c. and d. The proper size starting bar must be selected to ensure mechanical properties of finished fasteners are represented by the mechanical properties of the starting bar. e. The mandatory testing, axial tensile (studs) and wedge tensile (screws and bolts) must be performed on full sized fasteners. Note that there is a typographical error in paragraph 4.5.2.7 and that the axial load test is a mandatory test that must be performed on studs as required in paragraph 4.5.2.7.e. 3.11.2 Thread rolling is a cold working process and is not considered to be a machining or grinding operation. Therefore, fasteners which have rolled threads do not satisfy the provisions of MIL-DTL-1222J paragraph 4.5.2.7.b and are not eligible for the ""Alternate Mechanical Testing"" provision. 3.11.3 Thread rolling alone is not a sufficient cold working process to qualify a fastener to be in the cold worked (CW) condition. This condition is only applicable to some 300 series stainless steel studs, screws and nuts. These CW condition fasteners must be manufactured from cold worked bar stock or be cold headed in order to qualify. The threads may subsequently be rolled, machined or ground. Testing of the finished fasteners and/or reporting of the starting bar stock material properties is subject to the same provisions found in MIL-DTL-1222J paragraph 4.5.2.7 and discussed above. 3.12 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable. 3.13 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 765007000; ) must be added. When no plate is specified, an identification plate in accordance with MIL-DTL-15024, Type ""C"" on brass or Type ""H"" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached. 3.14 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, 0900-LP-001-7000 for brazing of piping and pressure vessel applications, or S9074-AQ-GIB-010/248 for brazing of other applications. For all production and repair welding and brazing personnel and procedures must be qualified under S9074-AQ-GIB-010/248 or 0900-LP-001-7000, as applicable. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing. 3.15 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. 3.16 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format. Definitions are provided elsewhere in the Contract/Purchase Order. 3.16.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide a copy of this request to the QAR. Requests must include the information listed below. a. A complete description of the contract requirement affected and the nature of the waiver/deviation (non-conformance), including a classification of Critical, Major, or Minor. b. Number of units (and serial/lot numbers) to be delivered in this configuration. c. Any impacts to logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel or impacts to the operational use of the product. d. Information about remedial action being taken to prevent reoccurrence of the non-conformance. 3.16.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted to the NAVSUP WSS Contracting Specialist via eMail. 3.16.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information: a. The change priority, change classification (Class I or Class II), and change justification. b. A complete description of the change to be made and the need for that change. c. A complete listing of other Configuration Items impacted by the proposed change and a description of the impact on those CIs. d. Proposed changes to documents controlled by the Government. e. Proposed serial/lot number effectivities of units to be produced in, or retrofitted to, the proposed configuration. f. Recommendations about the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.17 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection. 3.18 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further application of the above documents is prohibited.prohibited. 3.18.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.19 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.20 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as part of the certification OQE package submitted by the Contractor. Note: These requirements do not apply to tack/spot welds when the conditions of Section 4.2.1.1 of S9074-AR-GIB-010A/278 are met. 3.20.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair). 3.20.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted, citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'') 3.20.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010/248, S9074-AR-GIB-010A/278, and the contract. 3.20.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application. 3.20.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual agreement between the vendor and DCMA. 3.20.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted as part of the qualification data. 3.20.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element. 3.20.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278. 3.20.9 When production or repair welding is required on titanium materials, the applicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval. 3.20.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training plan, and active welder qualification must be submitted at the same time as theapplicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF. 3.20.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following: a) Filler Metal LOT number(s) b) Specification and Type c) A positive statement that the vendor has obtained OQE and verified thateach LOT of weld filler material conforms to specification requirements. d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption. 3.20.12 When production welds or repair welds are performed by a subcontractor,the requirement for submission of all certification documentation required herein must be passed down to the subcontractor. 3.21 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.21.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.21.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.21.3 See CDRL DI-QCIC-81110 (Inspection System Procedures...
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/529c03ffe9d242aaad3f89dee345bf2a/view)
- Record
- SN07238368-F 20241012/241010230102 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |