SOLICITATION NOTICE
43 -- 43--COMPRESSOR, IN REPAIR/MODIFICATION OF
- Notice Date
- 9/10/2024 1:22:45 AM
- Notice Type
- Solicitation
- NAICS
- 333914
— Measuring, Dispensing, and Other Pumping Equipment Manufacturing
- Contracting Office
- NAVSUP WEAPON SYSTEMS SUPPORT MECH MECHANICSBURG PA 17050-0788 USA
- ZIP Code
- 17050-0788
- Solicitation Number
- N0010424RZC34
- Response Due
- 9/11/2024 11:00:00 AM
- Archive Date
- 09/26/2024
- Point of Contact
- Telephone: 7176057574
- E-Mail Address
-
ASHTON.K.PERRY.CIV@US.NAVY.MIL
(ASHTON.K.PERRY.CIV@US.NAVY.MIL)
- Description
- CONTACT INFORMATION|4|N742.11|WR4DD|717-605-7574|ashton.k.perry.civ@us.navy.mil| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2||| INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X|||||| TIME OF DELIVERY (JUNE 1997)|20|CLIN 0001|TWO (2)|365 Days|||||||||||||||||| REPAIR DELIVERY (FIRM FIXED PRICE)|1|365 days| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16| Certifications - Stand-Alone Receiving Report Material - Receiving Report & Invoice Combo|Material - Inspect & Accept at Source |TBD|N00104|TBD|Certifications - TBD/Material - TBD|Certifications - TBD/Material - SW3215|TBD|N/A|N/A|N/A|See form DD1423|N/A|N/A|See form DD1423|1-866-618-5988 - WAWF Helpdesk| NOTE FOR CONTRACTOR/ADMINISTRATIVE CONTRACTING OFFICER|3|||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS| FIRM FIXED PRICE REPAIR PURCHASE ORDERS|1|TBD| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)|4||||| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|One year from date of delivery.|One year from date of delivery.||||| WARRANTY OF DATA--BASIC (MAR 2014)|2||| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024)|13|333914 |750 (# of employees)|||||||||||| TYPE OF CONTRACT (APR 1984)|1|Firm Fixed Price| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X| 1. This is an Advanced Equipment Repair Program (AERP) Requirement. 2. Please provide a Firm-Fixed Price (FFP) qualifying proposal for the full repair effort of the requirement. Please include the cost of new or estimated cost of new with the submitted proposal. 3. All contractual documents (i.e. contracts, purchase orders, task orders,delivery orders, and modifications) related to the instant procurement areconsidered to be ""issued"" by the Government when copies are either deposited inthe mail, transmitted by facsimile, or sent by other electronic commercemethods, such as email. The Government's acceptance of the contractor'sproposal constitutes bilateral agreement to ""issue"" contractual documents asdetailed herein. 4. Any contract awarded as a result of this solicitation will be DO certifiedfor national defense use under the Defense Priorities and Allocations System(DPAS). Provision 52.211-14, Notice of Priority Rating for National Defense,Emergency Preparedness, and Energy Program Use, shall be inserted in solicitations when the contract to be awarded will be a rated order. 5. Repair Turnaround Time (RTAT): the resultant contractual deliveryrequirement is measured from asset Return to the date of asset acceptance underthe terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAVmust be dated to reflect the actual date of physical receipt. The Contractormust obtain final inspection and acceptance by the Government for all assetswithin the RTATs established in this contract. Requested RTAT: 365 Days Proposals shall reference the proposed RTAT and any capacity constraints. Please provide repair price as firm fixed price (FFP). Specify on proposalFFP. If you choose firm repair pricing, consider the following: Include repair price with all costs associated with receipt and complete repairof material that may be in unwhole condition, missing hardware, damaged,handling damage, missing parts, wear damage, and CAV reporting. All transportation to/from repair site will be paid for by US Navy. Also, please provide: Teardown and Evaluation Rate: _______ RTAT: _____________ Throughput Constraint: __________ Induction Expiration Date: _________ 6. Price Reduction: Any assets for which the contractor does not meet the required RTAT will incur a price reduction of (TBD Price) per unit. This adjustment will be implemented via a reconciliation modification at the end ofcontract performance. Price reductions made pursuant to this section shall notlimit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. \ 1. SCOPE 1.1 This contract/purchase order contains the requirements for manufacture or refurbishment and the contract quality requirements for the COMPRESSOR . 2. APPLICABLE DOCUMENTS 2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order, however, must supersede applicable laws and regulations unless a specific exemption has been obtained. 2.1.1 Documents, drawings, and publications supplied are listed under ""Drawing Number"". These items should be retained until an award is made. 3. REQUIREMENTS 3.1 Refurbished Material - This item must be inspected and where necessary, refurbished to be in accordance with CAGE ;28953; , drawing ;D3084; ,and the applicable SUBMEPP Repair Instruction ;R.I. 5515-012-1126 Rev D Chg 3 (CSD479); , except as amplified or modified herein. 3.1.1 Parts that are replaced during refurbishment must be in accordance with this TDP (Technical Data Package) and the SUBMEPP Repair Instruction. 3.2 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD479, CSD474, CSD475, CSD476, CSD477 and CSD478; in ECDS at https://register.nslc.navy.mil/ 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. 5.1.1 Additional Preservation, Packaging, Packing and Marking requirements are included in the referenced Refurbishment Instruction or Procurement Specification from SUBMEPP. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible. DATE OF FIRST SUBMISSION=ASREQ DATE OF SUBSEQUENT SUBMISSION=ASREQ See CSD (contract support document) called out within paragraph 3 - Requirements. All CSDs are to be obtained from ECDS (Electric Contractor Data Submission) at:https://register.nslc.navy.mil/. Certification documentation must be submitted via WAWF (Wide Area Work Flow)to the maximum extent possible.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/9f359df979f04ed3ade4cea33bada7e9/view)
- Record
- SN07205592-F 20240912/240910230122 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |