Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 30, 2024 SAM #8312
SOLICITATION NOTICE

Z -- Z--BLUE RIVER FISH BARRIER MAINTENANCE

Notice Date
8/28/2024 2:04:08 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
LOWER COLORADO REGIONAL OFFICE BOULDER CITY NV 89005 USA
 
ZIP Code
89005
 
Solicitation Number
140R3024R0036
 
Response Due
9/6/2024 3:00:00 PM
 
Archive Date
09/21/2024
 
Point of Contact
Bell, Larissa, Phone: 7022938528
 
E-Mail Address
lrbell@usbr.gov
(lrbell@usbr.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
BLUE RIVER FISH BARRIER MAINTENANCE Amendment 02: The purpose of this amendment is to incorporate the following: A. Attachment 7 - Questions and Answers B. Attachment 8 - SF 1444 C. Attachment 9 - 344-331-498 Blue River Fish Barrier Plan D. All other terms and conditions remain unchanged. Please review amendment 02 and update your quote if necessary. The purpose of Amendment 01 is to update the RFP questions due date. The questions due date is hereby changed from August 16, 2024 at 5:00pm (1700), PDT to August 22, 2024 at 12:00 (1200), PDT. All other terms and conditions remain unchanged. The Bureau of Reclamation (Reclamation), Interior Region 8: Lower Colorado Basin intends to award a single fixed-price contract estimated to be between $250,000 and $500,000 to acquire contractor services to perform the following principle components at the Blue River Fish Barrier in Arizona: 1. Removal of four damaged existing 4 ft x 4 ft steel plates on the concrete apron. 2. Installation of steel plates at the locations as shown on the drawings: 3. 4 ft x 4 ft steel plates on the concrete apron of the fish barrier. 4. 3 ft x 4 ft steel plates on the concrete apron of the fish barrier. 5. 8 in steel plates centered on top of the crest wall. 6. Installation of steel angles and grout repair at the locations as shown on the drawings: 7. 6 in x 6 in steel angles on the downstream edge at the top of the crest wall and concrete apron as shown. 8. Nonshrink grout repair and placement on crest wall edge and edge of apron. Estimated quantity of nonshrink grout is 1 cubic yard. Work is located approximately 15 miles northeast of Clifton, Arizona in Greenlee County, and approximately 2,800 feet upstream of the confluence of the Blue and San Francisco Rivers, on the Blue River.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f4d6a23593a14396a17aa8bda7bf2018/view)
 
Record
SN07189993-F 20240830/240828230126 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.