Z -- 689-24-0130, Boiler Plant PRV Stations #1 and #2

Notice Date
7/30/2024 12:54:54 PM
 
Notice Type
Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
241-NETWORK CONTRACT OFFICE 01 (36C241) TOGUS ME 04330 USA
 
ZIP Code
04330
 
Solicitation Number
36C24124B0047
 
Response Due
8/23/2024 8:00:00 AM
 
Archive Date
09/22/2024
 
Point of Contact
Cecilia Antwi, Contract Specialist
 
E-Mail Address
Cecilia.Antwi@va.gov
(Cecilia.Antwi@va.gov)
 
Awardee
null
 
Description
CONTINUATION PAGE 02 36C24124B0047 RFI s and REPONSES Question 1. Please confirm that threaded fittings will not be allowed on this project. Response f)-Butt weld all piping above 2-1/2 and above, Butt weld or socket weld all piping 2 or less diameter. Raised faced flanges or unions are required to permit ease of removal and servicing working parts without disturbing connecting piping. If threaded pipes required (shall be Schedule 80), request shall be in writing to COR for approval. Question 2. Please confirm that the stations will need to be fabricated off site and tied in and installed during a weekend steam shutdown. Response d)- All work shall be performed off site. Prefabricate all piping, perform radiographic testing of 100% of the butt-welded joints and pressure test all piping (including header, spool pieces, steam trap assembly piping, etc.) offsite. All piping shall be assembled onsite at the VAMC, ensure to leak test all joints after the tie-ins. Response e)- Complete the steam PRV stations installation tie-ins during one steam shutdown. Steam shutdown shall only occur between May 1st through September 30th. 30 days advance notice required. Maximum duration- not to exceed Friday 7:00pm to Sunday 7:00pm. Cool down and reheat times shall be included in this time frame, approximately 2 hours each. Question 3. Please confirm that prefabricated piping and fittings will have to be X-Ray welded. Response q)- Perform radiographic testing of 100 percent of the welds. All radiographs shall be reviewed and interpreted by an ANST Certified Level III radiographer, employed by the testing firm, who shall sign the reading report.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/75b6e5012f9544ebb85e502eb363ef96/view)
 
Record
SN07148754-F 20240801/240730230118 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.