SOLICITATION NOTICE
Z -- Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements
- Notice Date
- 6/13/2024 12:44:20 PM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- W074 ENDIST SAVANNAH SAVANNAH GA 31401-3604 USA
- ZIP Code
- 31401-3604
- Solicitation Number
- W912HN24B5004
- Response Due
- 7/17/2024 9:00:00 AM
- Archive Date
- 06/06/2025
- Point of Contact
- Amy Collins, Phone: 9126525505, Glenda Canty, Phone: 912-652-5030
- E-Mail Address
-
amy.l.collins@usace.army.mil, glenda.a.canty@usace.army.mil
(amy.l.collins@usace.army.mil, glenda.a.canty@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- NOTE:� A site visit is scheduled for 20 June 2024 at 10:00 am. The address is 99 Grand Prize of America, Savannah, GA 31401. The POCs are Jeremy Miller 912-652-5192 (office)/912-318-8146 (cell) and Samantha Holzinger 912-652-6017 (office)/912-724-0676 (cell).� �If you cannot make this one please reach out to these POCs to set up one if needed.� Savannah Harbor Expansion Project (SHEP) 14A Dike Raising and Weir Improvements - The existing back dike currently spans a length of approximately 11,000 feet and has a crest elevation ranging from about 27 to 29 feet mean lower low water (MLLW). The back dike will be raised to a uniform elevation of 33 feet MLLW. The existing front dike currently spans a length of approximately 6,400 feet and has a crest elevation ranging from about 25 to 27 feet MLLW. The front dike will be raised to a uniform elevation of 31 feet MLLW to gain additional capacity for containment of Savannah Harbor dredged material. Approximately 231,000 cubic yards of borrow material from the adjacent 14B DMCA will be required for the raising of the back dike and approximately 65,000 cubic yards for the front dike. Additional borrow materials from the adjacent 14B DMCA may be needed. Weir modifications for weirs 14A1, 14A2, and 14A3 are anticipated, as well as resetting the abutment on cross-dike weir 14A/B. The borrow material consists of dredge materials from the Savannah River. The dike construction will be performed to the inside of the existing dike crest and slope. Additional project requirements include clearing, grassing, and erosion control provisions.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/fb27c445ce244b369a5b2057a3b8c8e1/view)
- Record
- SN07096506-F 20240615/240613230120 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |